Title: CONTROLS FOR LEIR


1
CONTROLS FOR LEIR
  • M.Pace for the AB/CO group

2
AGENDA
  • Schedule and present status
  • Boundary conditions
  • Infrastructure
  • Timing proposal
  • Interfaces to equipment
  • Resources estimate
  • Issues and risks

3
Schedule and Present Status
4
BOUNDARY CONDITIONS
  • Design constraints
  • Classical PS Complex-like infrastructure
  • Timing integrated into existing CBCM
  • Eradication of CAMAC for equipment interface
  • User requirements
  • Rejuvenated/new interfaces
  • Physics oriented operation
  • Strategy
  • Use standard modules (SW HW)
  • Limit new development integration efforts

5
INFRASTRUCTURE
6
TIMING PROPOSAL
  • Main features
  • PPM machine (Pulse to Pulse Modulated)
  • Synchronisation with Lin3 CPS
  • Variable cycle length
  • 3.6 s or any number of Basic Periods
  • New Telegram to pilot Lin 3 LEIR
  • Integration into CBCM Standard operation
  • Constraints
  • No Lin3 gt PSB operation
  • Predefined cycle length (no pause button)

7
Courtesy of J.Lewis
8
INTERFACE TO POWER SUPPLIES (1)
  • Classical configuration
  • for most supplies (150)
  • Incl. 60 function generators

Courtesy of F.di Maio
9
INTERFACE TO POWER SUPPLIES (2)
  • Industrial configuration
  • ONLY for 10 e- cooler HV supplies (optic fiber)
  • Status
  • Preliminary inventory of CO modules
  • Technical issue on G64 crate

Courtesy of F.di Maio
10
OTHER INTERFACES
  • To beam diagnostics instrumentation
  • Next step
  • Review of HW SW modules from Eastern 2003
  • To vacuum and baking system
  • Status
  • Industrial controls based upon PLC interfaces and
    PVSS programs
  • Under LHC/VAC responsibility
  • Next step
  • Integration of Controls Middleware server into
    vacuum server machine for access from Operation
    programs (mainly ALARMS)
  • To RF and e-cooling systems

11
RESOURCES ESTIMATE
  • Cost
  • Preliminary estimate over 2003 - 2006 kCHF
  • 2003
  • 2004
  • 2005
  • 2006
  • Manpower
  • Preliminary estimate over 2003 2006
  • From AB/CO 5 FTE
  • From AB/OP (application development) 2 FTE
  • WARNING !
  • Manpower dedicated to LEIR creates HOLES in other
    CO activities

Cost suppressed
12
COST ESTIMATE
Cost suppressed
13
ISSUES AND RISKS
  • MAJOR ISSUE TIMING system
  • Critical manpower
  • Competition with deployment of new timing in SPS
    at start-up 2004
  • Team limited to 2 experts
  • Risk of delay depends on agreed solution

Proposal NO Lin-3 gt PSB operation