Title: Airports DEALING WITH CONGESTION ON THE GROUND
1AirportsDEALING WITH CONGESTION ON THE GROUND
EUROCONTROL Press Open Day Brussels, 17 November
2005
G. Paulson EUROCONTROL Director ATM Programmes
European Organisation for the Safety of Air
Navigation
2MAIN DRIVERS
- Safety
- Capacity, delay and airside efficiency
- Environment
3MILAN - LINATE
4European Action Plan for the Prevention of Runway
Incursions
- Recommendation areas
- General Principles
- Aerodrome Operator Issues
- Communications
- Aircraft Operator Issues
- ANSP Issues
- Data Collection and Lesson Sharing
- Regulatory Issues
- Aeronautical Information Management
- Future Work
- Safety Teams
- Out of 120 ECAC airports 91 have established
runway safety teams
5Progress Runway Incursions
Reporting culture is improving
Severity of incidents is decreasing
6SAFETY NET DEVELOPMENT
EXISTING RUNWAY SAFETY NET
THE FUTURE?
7SAFETY
- Enhance existing safety nets
- Extend technology based safety nets to cover all
of the airport movement area - Target to reduce the number of serious runways
incursions by 50 before 2009
8TRAFFIC IS SET TO GROW
2.5 growth factorif sufficientairport capacity
- Demand corresponding to 3.7 M flights/yr cannot
take place - More than 60 airports will be congested
- Top-20 airports will be saturated at least 8-10
hrs/day
2.0 growth factor with max achievable airport
capacity
9Primary departure delay causes
10WHERE IS THE PROBLEM?
11AIRPORT SHARE OF DELAY SET TO GROW
12Improving airports
R D
TRAFFIC
R D
R D
Surface Management
Low visibility procedures
R D
R D
R D
CDM
Latent capacity
Approach separation
Slot process Enhancement
CAPACITY
2012
2011
2010
2009
2007
2008
2005
2006
TARGET MAINTAIN AVERAGE ATM AIRPORT DELAY BELOW
ONE MINUTE
13Capacity the main initiatives
- Implement
- Capacity enhancement
- Assess and increase capacity
- Review separation standards
- Review wake vortex separations
- Airside efficiency
- Change airport slot practices
- Manage surface movements
- Airport network
- Facilitate regional airports
- Target
- Average airport ATM delay maintained at less than
1 minute - Satisfy the 2025 demand
14ENVIRONMENT
- THE CHALLENGE (PC MEDIUM TERM OBJECTIVE)
- Reduce aircraft noise and emission levels
- THE APPROACH
- Provide environment training and improved impact
assessment tools - Implement collaborative environmental management
- Implement impact reduction techniques such as
continuous descent approach, airside capacity
enhancement (ACE) and P-RNAV
15Airports New initiative
- Release latent capacity
- Enhance airside efficiency
- Facilitate regional airports
- Improve airside safety
- Reduce noise and emissions
- Target
- Satisfy the 2025 demand
- 1 min. delay
- 50 drop in runway incursions