Implementation of CPDLC Services across Europe - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Implementation of CPDLC Services across Europe

Description:

Implementation of CPDLC Services across Europe. IATA Position. Link 2000 workshop, 15/16 February 2005. Gerry O'Connell. Assistant Director ... – PowerPoint PPT presentation

Number of Views:130
Avg rating:3.0/5.0
Slides: 12
Provided by: ralp83
Category:

less

Transcript and Presenter's Notes

Title: Implementation of CPDLC Services across Europe


1
Implementation of CPDLC Services across Europe
 
  • IATA Position

Link 2000 workshop, 15/16 February 2005
Gerry OConnell Assistant Director Safety,
Operations Infrastructure, Europe
2
  • Data communication
  • VDL Mode 2
  • Airline position on Link2000
  • Way forward

3
Safety
Between 1976 and 2000 more than 1,100 passengers
and crew lost their lives in accidents in which
investigators determined that voice
communications had played a Contributory
role (ICAO Journal Jan. 2004)
Data Communication !
4
The Facts
  • Data communications enables
  • Enhanced Safety
  • Increased efficiency
  • Increased capacity
  • Delay reduction
  • Less frequency congestion and
  • Lower infrastructure costs

5
Risks
  • Reduction of safety
  • Ambiguity of information/messages
  • Differences in interpretation of CPDLC messages
  • Lack of harmonization ATM functions
  • Loss of efficiency
  • Non-transparent procedures
  • Lack of ground automation
  • Increased costs
  • Too much technical solutions
  • Late introduction of data based Air Traffic
    Services
  • Overstated requirements

6
Why VDL Mode 2 ?
  • Available now
  • Increasing equipage and services
  • Easy transition from ACARS
  • Global solution
  • Meets ATS service requirements
  • Increasing States/ANSP consensus (11th ANC)
  • Low technical risk
  • Ground services being deployed
  • Alternatives are not making business sense

7
VDL Mode 2 a progression from ACARS
  • Growth data communication
  • Enables new uses for data link communications
  • Augments VHF ACARS worldwide
  • Relieves VHF frequency demand

8
Airlines Position on LINK2000
  • After extensive discussions with IATA/AEA
    Airlines delivered a position on the proposed
    Rule
  • IATA/AEA Airlines support a mandate for CPDLC
    over ATN/VDLM2 for new aircraft per 31 March 2009
  • IATA/AEA Airlines agree only on a mandate for
    retrofit aircraft per 31 March 2014 provided some
    relevant issues are properly addressed and taken
    into account in the text of the Rule

9
Airline Issues
  • Implement an incentivised retrofit scheme
  • Aircraft manufacturers and VDL Mode 2 equipment
    vendors need to lower the cost of the embodiment
  • Need to reconsider the ICAO data recording
    requirement for retrofit aircraft
  • Need for a harmonized MEL policy
  • Need for appropriate exemptions for aircraft that
    cannot be economically equipped

10
Airline Issues (2)
  • FANS 1/A aircraft accommodation without ops
    restrictions and no extra cost to the airspace
    user
  • Eurocontrol to demonstrate and monitor efficiency
    improvements
  • Ensure that the full capability coverage of the
    ATS System is operationally available
    (integration into ATS platforms, controller
    training etc)

11
Way Forward
  • Equipment manufacturers - Provide equipment in
    time at reasonable costs
  • Airframe manufacturers - Encourage forward fit
  • Communication providers -Provide an equitable
    service
  • Air Navigation Service providers -Commit,
    implement and share the benefits
Write a Comment
User Comments (0)
About PowerShow.com