Identifying Waste Sites for North London Waste Plan - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Identifying Waste Sites for North London Waste Plan

Description:

Boroughs working together as planning authorities. Share skills ... All short listed sites to be visited. Neighbouring uses, visual intrusion, site entrances ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 23
Provided by: env74
Category:

less

Transcript and Presenter's Notes

Title: Identifying Waste Sites for North London Waste Plan


1
Identifying Waste Sites for North London Waste
Plan
  • Archie Onslow

2
Structure
  • Background to NLWP
  • Methodology for identifying sites
  • Feedback from consultation

3
1 Background to the Plan
4
Why a joint plan?
  • Boroughs working together as planning authorities
  • Share skills
  • History of collaboration on waste issues in North
    London
  • Find sites over 7 boroughs

5
Where does NLWP fit in?
  • National planning guidance
  • Mayors London Plan
  • Borough community strategy
  • Borough local development framework

6
Who is involved?
  • Programme Manager
  • Consultants Mouchel with CAG Consultants
  • Steered by borough planning staff
  • Heads of Planning
  • Planning Members Group
  • Ratified by boroughs at each stage

7
What is NLWP about?
  • Consider amount of different types of waste in
    2020
  • Consider types of facility required
  • Identify sites to deal with waste
  • Deal with apportioned tonnage as minimum
  • Consider CD and hazardous waste

8
How NLWP differs from the North London Waste
Strategy
  • Deals with all waste not just municipal
  • NLWA or agents will have to submit planning
    application to boroughs
  • Balances needs for waste facilities with other
    needs and aspirations in boroughs

9
Timetable for NLWP
  • Will finish in 2010
  • Issues and options January 2008
  • Preferred options January 2009
  • Submission September 2009
  • Examination March 2010
  • Adoption December 2010

10
Preferred Options stage
  • Consider consultation responses
  • Develop site options
  • Include results from assessments on
    sustainability, habitats, flooding
  • Policy framework

11
2 Methodology for identifying sites
12
London Plan broad locations
  • Existing waste facilities
  • Preferred industrial locations
  • Local Employment areas

13
NLWP site process
  • Long list of sites
  • Criteria
  • Site visit
  • Develop options

14
Long list of sites
  • Data sources
  • Existing waste sites
  • Data from GLA (2006)
  • Data from NLWA
  • NLUD-PDL (2006)
  • Sites suggested by public consultation
  • Sites suggested by boroughs

15
Criteria 1
  • Show stoppers
  • Metropolitan open land
  • Grade 1 agricultural land
  • (Inter)national nature conservation
  • (Inter)national heritage
  • Category 1 flood plain

16
Criteria 2
  • Constraint based criteria
  • Flood risk
  • Opportunity based criteria
  • Proximity to heat networks or development areas
  • Scoring
  • Weighting?

17
Site visit
  • All short listed sites to be visited
  • Neighbouring uses, visual intrusion, site
    entrances
  • Collect information for detailed planning

18
Constructing options
  • Assess capacity needs
  • Construct range of options
  • Assess options
  • Additional policy framework

19
3 Feedback from consultation
20
Issues Options Consultation
  • Website www.nlwp.net
  • Information leaflet
  • Advertising
  • 7 public workshops
  • 10 follow up meetings
  • 300 attended
  • 70 written responses

21
Issues Options Responses
  • Strong views on waste minimisation and on
    incineration and health
  • Call for geographic and social equity
  • Strong views on some locations
  • Flexible on technologies but strong safeguards
  • Growth figures and policy challenged

22
Contact details
  • Archie Onslow
  • archie.onslow_at_camden.gov.uk
  • 020 7974 5916
  • www.nlwp.net
Write a Comment
User Comments (0)
About PowerShow.com