Title: Nessun titolo diapositiva


1
Mediterranean Free Flight Programme
Presentation to Safety Regulation Commission
2
Mediterranean Free Flight Programme
  • Objectives of the presentation
  • Inform the SRC of the MFF Programme and
    objectives
  • Provide an overview of MFF Safety Activities
  • Initiate a dialogue between the MFF Programme and
    the SRC and SRU
  • Identify further actions

THE APPROACH
3
Mediterranean Free Flight Programme
  • MFF is a pre-operational Programme conducted by a
    consortium of six service providers and
    EUROCONTROL which is part funded by the European
    Commission.
  • ESARR 4 is the principal Safety Regulatory
    Requirement for MFF

4
MFF Objectives
  • The MFF objectives are
  • Evaluate the integration, interoperability and
    safe use of ADS-B technologies and applications
    suitable in a future Mediterranean ATM scenario
  • To verify appropriate new operating procedures
    for ATM staff and aircrew in
  • free flight scenarios
  • transition between FFAS and any other airspace
  • To address standardisation and further maturation
    of relevant ADS-B technologies and applications
    both in ground systems and avionics
  • To define guidelines to implement free flight
    operations in suitable parts of the airspace.

5
MFF Overall Timetable
6
MFF - Related Programmes
  • ADS Programme
  • ADS MEDUP (Mediterranean Upgrade Programme)
  • AFAS (Aircraft in the Future ATM System)
  • FRAP (Free Route Airspace Project)
  • LINK 2000 Programme
  • NUP (NEAN Update Programme)
  • PETAL-II (Preliminary EUROCONTROL Test of
    Air/ground data Link)

7
MFF Programme Structure
8
SMS within MFF
  • Safety management ensured with the support of SQS
  • Safety deliverables developed according to the
    EUROCONTROL best practices
  • Safety Policy
  • Safety Plan
  • Safety Assessment documentation
  • MFF Safety Policy (D721)
  • MFF Safety Plan (D722)
  • MFF Safety Case Design (D731)
  • MFF Preliminary Safety Case (D732) TBD in 2002
  • MFF Intermediate Safety Case (D733) TBD in 2003
  • MFF Final Safety Case (D734) TBD in 2004

9
SMS approach within MFF
10
MFF and SRC/SRU Interface Further Actions
  • Interface will be handle according to the SRC DOC
    6 SRC - EATMP Interface
  • Initial contact has been established with SRU
  • SRC 14 first contact with SRC
  • Formal submission of the first safety
    deliverables will follow
  • A regulatory baseline (RAD-MFF) will be required
    if possible by end of 2002

11
Potential Issues
  • Mismatch between national legislation and ESARR
  • How to make best use of Real Time simulations
  • Making the best use of results from other projects

12
Summary
  • This presentation was designed to
  • Inform the SRC of the Programme and objectives
  • Provide an overview of MFF Safety Activities
  • Initiate a dialogue between the MFF Programme and
    the SRC and SRU
  • Identify further actions
  • QUESTIONS ?