Central Utility Plant Automation
  • Presented by Mike Conway
  • Utility Plant Manager

2
Central Utility Plant
3
CUP Layout
4
Original Automation System
  • Original automation system was part of the site
    JCI BAS
  • This system provided limited control of equipment
  • Opened chiller valves
  • Controlled the cooling tower
  • Alarmed on various conditions
  • Major equipment started/stopped from the field
  • Operators had no visual information other than
    text data

5
Why Install a New Control System?
  • Reduce energy costs
  • Connect to recently installed systems
  • Increase reliability
  • Maintain staffing levels in a more complex
    environment
  • Automate reporting and archiving

6
Original Project Concept
  • The original project appropriation was approved
    as a replacement type project with some
    upgrades

7
Final Project Concept
  • The project scope evolved as the design of the
    automation system progressed. The project team
    realized that what we put in place would be here
    for approximately 20 years.

8
The final project was supported by additional
capital dollars to
  • Increase boiler house instrumentation
  • Increase chiller plant instrumentation
  • Increase cooling tower instrumentation
  • Increase electrical instrumentation
  • Install new valve actuators
  • Install VFDs on all major systems
  • Reconfigure the emergency power system

9
Accomplishments
  • Creation of Energy Central
  • Operators can see all critical data real time
  • Steam load
  • Electrical load
  • Electrical production
  • Chiller load

10
(No Transcript)
11
Accomplishments
  • Revised Chiller Sequences
  • Chiller plant operation revolves around the
    cogeneration system
  • During the winter months cogen steam is used for
    heating
  • During the shoulder months cogen steam is used
    for process and in absorption chilling
  • Summer operational base is one 1500 ton steam and
    one 1500 ton electric chiller

12
Accomplishments
  • Automatic Peak Shaving
  • This site uses its diesel generators to limit
    electrical peak demand
  • Concept ties directly to chiller plant operation
  • On peak demand days all absorption chillers are
    already running and additional electric chillers
    are staged in
  • The diesel generators are used to clip this
    peak demand for approximately 300 hours per year

13
Accomplishments
  • Increased plant performance through
    instrumentation
  • Knowing where the water is
  • Troubleshooting of equipment