Project specifications
  • Division 1- general conditions
  • Division 2- sitework
  • Division 3- concrete
  • Division 4- masonry
  • Division 5- metals
  • Division 6- carpentry
  • Divisions 1-6 are frequently selfperform

2
Project specifications
  • Division 7- thermal and moisture protection
  • Division 8- doors, windows, hardware
  • Division 9 finishes
  • Division 10- specialties
  • Division 11- equipment
  • Division 12- furnishings
  • Division 13- special construction

3
Project specifications
  • Division 14- conveying systems
  • Division 15- mechanical
  • Division 16-electrical
  • Divisions 7-10, 14 typically subcontracted
  • Divisions 11-13 typically by owner (except fire
    suppression, sometimes in 15)
  • Divisions 15, 16 subcontracted or multiple prime

4
Technical subsections
  • Section 0000
  • 1.0 General-
  • 1.1 work included
  • 1.2 related work
  • 1.3 references (AISI, ASTM, AWS, UL,
  • 1.4 system description (tolerance)
  • 1.5 submittals (finish schedule, samples, O/M)
  • 1.6 quality assurance
  • 1.7 delivery storage protection
  • 1.8 warranties

5
Technical subsections
  • 2.0 Products
  • 2.1 manufacturers
  • 2.2 materials (composition, thickness)
  • 2.3 accessories and associated materials
  • 2.4 fasteners
  • 2.5 fabrication (sizes, fit, process)

6
Technical subsections
  • 3.0 Execution
  • 3.1 examination of related work
  • 3.2 coordination of related work
  • 3.3 field inspections
  • 3.4 permits and government compliance
  • 3.5 application and installation
  • 3.6 finish state
  • 3.7 cleaning
  • 3.8 schedule, color, joints, ratings

7
Project specifications
  • Define the scope of work
  • Necessary for delineation of responsibility in
    subcontracts and purchase orders
  • Outlines related work and coordination
  • Need to review for overlap of responsibility
  • Need to review for failure to assign
    responsibility
  • Example at ltconstructionbidding.comgt