Procurement and Operation of Green Vehicles - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

Procurement and Operation of Green Vehicles

Description:

... be non-operational before Warranty Repair is Completed) ... the requirement for Maintenance and Repair manuals and how are they approved by the Agency? ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 11
Provided by: rlef
Category:

less

Transcript and Presenter's Notes

Title: Procurement and Operation of Green Vehicles


1
Procurement and Operation of Green Vehicles
  • Technical Considerations
  • November 6, 2008
  • C. Mikel Oglesby
  • General Manager, SunLine Transit Agency

2
Before You Skip Down the Green Highway
  • Consider Regional Politics
  • Consider Regional Partners (Regional
    Transportation Plan Participants)
  • Consider Funding Sources
  • Consider Operational Needs
  • Consider Regulatory Requirements

3
The SunLine Story
  • Told on MITs Department of Urban Studies Website
  • Aging Fleet
  • Board Concurrence on Alternative Fuels
  • Extended Network of Original Equipment
    Manufacturers, Colleges, and the Local Gas
    Company
  • Commitment to Zero Emissions
  • Hydrogen Buss Introduced (i.e. H2ICE and Van
    Hool)
  • Recognized as Leader in Fuel Cell Technology

4
Items To Consider in Purchasing Green Rolling
Stock
  • Acquisitions Cost
  • Cost to Acquire the Technology
  • Cost to Maintain the Technology (Maintenance
    Profile)
  • Cost of Operational Infrastructure (Access to and
    Range before Re-Fueling)
  • Opportunity Cost of the Technology when Compared
    to Alternatives (CNG vs. Fuel Cell)

5
Items To Consider in Purchasing Green Rolling
Stock
  • Contractual Considerations
  • Is the Technology Developmental or Production
    (Developmental Projects carry more Schedule,
    Cost, and Quality Risk)?
  • In Joint Development Projects are all Members
    Committed Contractually to the result?
  • Is a Waiver of Buy America required?
  • What are Program Alternatives if a Joint
    Development Member Backs Out?
  • Are the Warranty Provisions adequate to Reduce
    Operational Risk (How Long can vehicle be
    non-operational before Warranty Repair is
    Completed)?
  • Contractual Provisions must be reviewed in Detail.

6
Items To Consider in Purchasing Green Rolling
Stock
  • Technical Requirements
  • Who will develop the Product Specification?
  • Who will verify that the Specification is
    Complete?
  • How will the Agency verify that Specification
    Requirements are met?
  • Is CARB Engine Certification Required?
  • How will Maintenance Staff be Trained on the New
    Technology?
  • What is the requirement for Maintenance and
    Repair manuals and how are they approved by the
    Agency?

7
Selection of Technology
  • Agencies Must Consider the Evolution of
    Technology
  • Nitrogen Oxides Particulates
  • 1994 Cummings L-10-G Engine compared to New L
    Cummings Gas Plus Engine
  • Old Engine produced 4.4 tons per year compared to
    New Engine with .18 tons per year of NOx

8
Selection of Technology
  • Will the Technology Meet Standards
  • EPA Standards
  • CARB Standards

9
Potential Pitfalls
  • Timing of the Funding
  • Verify that the Funding Profile matches the
    Agency Spend Plan
  • Lack of Community Support
  • Choosing the Best Available Technology
  • Lengthy Delivery Schedules add to the Risk of
    Purchasing Obsolete Technology
  • Not Integrating New Technology into Regional Plan

10
Conclusion
  • Political
  • Technical
  • Contractual
  • Regional
Write a Comment
User Comments (0)
About PowerShow.com