3Sediment / Erosion Control Acronyms
- NPDES National Pollutant Discharge
Elimination System - SWPPP Stormwater Pollution Prevention
Plan - SWMP Stormwater Management Plan
- CSW Construction Stormwater
- BMP Best Management Practice
- NOI Notice of Intent
- NOT Notice of Termination
AGC/NDOR Partners in Construction
4Timeline of Events
- Clean Water Act - 1974
- NPDES Phase 1 1992
- NE General Construction Stormwater Permit - 1997
- NPDES Phase 2 2003
- NE General Construction Stormwater Permit
2007???
AGC/NDOR Partners in Construction
5Spring 2005 - Program Changes
- NDEQ requested compliance with water quality
permits
AGC/NDOR Partners in Construction
6Minimum Requirements of CSW
- SWPPP required on projects with disturbance of 1
acre or more - Erosion Control Plan updated throughout
construction - Inspect every 7 days and after every ½ of rain
- Permit in effect until the site is 95
- re-vegetated
AGC/NDOR Partners in Construction
7Potential Permit Changes
- File Notice of Termination at 70 vegetative
cover - Inspect every 14 days and half inch of rain
- 7 days allotted for repairs of BMPs
- Revisions to SWPPP Manuals
- Signatures on all reports and forms
AGC/NDOR Partners in Construction
8- I certify, under penalty of law, that this
document and all attachments were prepared under
my direction or supervision in accordance with a
system designed to assure that qualified
personnel properly gathered and evaluated the
information submitted. Based on my inquiry of
the person or persons who manage the system or
those persons directly responsible for gathering
the information, the information submitted is, to
the best of my knowledge and belief, true,
accurate, and complete. I am aware that there
are significant penalties for submitting false
information including the possibility of fine and
imprisonment for knowing violations.
AGC/NDOR Partners in Construction
9404 Permit and Erosion Control
- Must do what is stated
- in the permit
- September 15 rule
- Seed tags turned into
- ACOE for wetland areas
- Specific species not
- allowed in mix
AGC/NDOR Partners in Construction
10Roadside Stabilization Unit Responsibilities
- Review all projects for final erosion control
needs and - make recommendations to the Designers
- Develop seed mixes and specifications
- Determine which projects require NOIs
- Write NOIs and get NDEQ approval
- Create the initial SWPPP manual
- Monitor projects for compliance and educate field
- personnel
- Maintain Erosion Control Approved Products List
- MS4 Permit development
- Spring 2007 - Vegetation Management
AGC/NDOR Partners in Construction
11Focus of 2008
- Education
- Training
- Certification
AGC/NDOR Partners in Construction
12(No Transcript)
13AGC/NDOR Partners in Construction
14AGC/NDOR Partners in Construction
15(No Transcript)
16Site Stabilization
- Appropriate Site Design
- Erosion Control
- Sediment Control
AGC/NDOR Partners in Construction
17Erosion Control vs. Sediment Control
- Reduces the
- impact of the
- raindrop
- Keeps soil
- particles in place
AGC/NDOR Partners in Construction
18Erosion Control vs. Sediment Control
- Used to trap and
- contain sediment
- once it starts to
- move
- LAST RESORT!
AGC/NDOR Partners in Construction
19NDORs Best Management Practices
- Currently updating Standard Plans
- and Specifications
- Reviewing BMPs for future use
AGC/NDOR Partners in Construction
20Research and Development
- University of Nebraska
- Texas Transportation Institute
- NDOR/Product Manufacturers
AGC/NDOR Partners in Construction
21AGC/NDOR Partners in Construction
22(No Transcript)
23(No Transcript)
24Future Training Opportunities
- Erosion Control Design
- Erosion Control for
- Construction
- Project Specific
- Product Distributors
- AGC
- IECA