TATA CARA PELAKSANAAN SERTIFIKASI LAIK
OPERASI 1. INSTALASI PENYEDIAAN TENAGA
LISTRIK 2. INSTALASI PEMANFAATAN TENAGA LISTRIK
SUBDIT KELAIKAN TEKNIK DAN KESELAMATAN
KETENAGALISTRIKAN (LANTAI II)
2
  • 1. INSTALASI PENYEDIAAN TENAGA LISTRIK
  • PEMBANGKIT (PLTD, PLTG, PLTU, PLTGU, PLTP,
    PLTA,
  • PLTMh, PLTB, PLTS)
  • INSTALASI TRANSMISI TENAGA LISTRIK
  • (SUTT 150 KV, SUTT 70 KV, SUTET 500 KV, SUTET
    275 KV)
  • INSTALASI DISTRIBUSI TENAGA LISTRIK
  • (JTM 20 KV, JTM 6 KV, JTR 0,4 KV)

SUBDIT KELAIKAN TEKNIK DAN KESELAMATAN
KETENAGALISTRIKAN (LANTAI II)
3
  • 2. INSTALASI PEMANFAATAN TENAGA LISTRIK
  • KONSUMEN TEGANGAN MENENGAH (PABRIK, INDUSTRI
  • PERKANTORAN, HOTEL, DSB)
  • KONSUMEN TEGANGAN RENDAH (RUMAH TANGGA, DSB)

SUBDIT KELAIKAN TEKNIK DAN KESELAMATAN
KETENAGALISTRIKAN (LANTAI II)
4
SKEMA TATA CARA SERTIFIKASI LAIK OPERASI
INSTALASI KETENAGALISTRIKAN
LEMBAGA INSPEKSI TEKNIK (TERAKREDITASI)
WAKTU (HARI)
PEMILIK INSTALASI
PEMERINTAH /DESDM
PERMOHONAN SERTIFIKAT KE LEMBAGA INSPEKSI
1
KONTRAK ANTARA PEMILIK INSTALASI DENGAN LEMBAGA
INSPEKSI TEKNIK
TEMBUSAN PERMOHONAN SERTIFIKAT
1 )
KETENTUAN, SYARAT, DAN ITEM TESTS UJI LAIK
OPERASI
UJI LAIK OPERASI INSTALASI
21 )
PERBAIKAN
PENGAWASAN TEKNIK (WITNESSING)
HASIL EVALUASI ?
TIDAK LAIK
7
LAIK
TEMBUSAN SERTIFIKAT LAIK OPERASI
SERTIFIKAT LAIK OPERASI
PENERBITAN SERTIFIKAT LAIK OPERASI
4
34
Catatan ) tergantung pemilik instalasi dan
lembaga inspeksi teknik )
tergantung kondisi dan kesiapan instalasi
TOTAL
5
Catatan ) tergantung pemilik instalasi dan
lembaga inspeksi teknik ) tergantung
kondisi dan kesiapan instalasi
6
SKEMA TATA CARA SERTIFIKASI LAIK OPERASI
INSTALASI PEMANFAATAN TENAGA LISTRIK KONSUMEN
TEGANGAN RENDAH
LEMBAGA INSPEKSI TEKNIK (KONSUIL)
WAKTU (HARI)
PEMILIK INSTALASI
PEMERINTAH /DESDM
PERMOHONAN SERTIFIKAT KE KONSUIL
1 )
KONTRAK ANTARA KONSUMEN DENGAN KONSUIL SERTA
MENYERAHKAN BIAYA DAN DOKUMEN TEKNIK
KETENTUAN, SYARAT, DAN ITEM TESTS UJI LAIK
OPERASI
UJI LAIK OPERASI INSTALASI
1)
PERBAIKAN INSTALASI OLEH INSTALATIR
PENGAWASAN TEKNIK
HASIL EVALUASI ?
TIDAK LAIK
1
LAIK
PENERBITAN SERTIFIKAT LAIK OPERASI)
1
Catatan ) tergantung konsumen dengan KONSUIL
dan kelengkapan dokumen teknik )
tergantung kondisi dan kesiapan instalasi
) KONSUIL melaporkan pelaksanaan
sertifikasi setiap 6(enam) bulan sekali ke DESDM
c.q. DJLPE
4
TOTAL
7
DAFTAR LEMBAGA INSPEKSI TEKNIK
8
DAFTAR LEMBAGA INSPEKSI TEKNIK
Selengkapnya dapat di akses di link
http//www.djlpe.esdm.go.id Home ? Informasi
? Teknik dan Lingkungan ? Kelaikan Teknik dan
Keselamatan

Ketenagalistrikan
9
ATURAN PENOMORAN PEMBANGKIT
  • JENIS USAHA INSTANSI - TAHUN OPERASI -
    PEMBANGKIT UNIT - BULAN - TAHUN SERTIFIKAT

JENIS USAHA PEMBANGKIT UNIT 0 - PKUK
(PLN) A PLTA (AIR) 1 - IUKU (PJB
IP) B PLTB (BAYU/ANGIN) 2 - IUKU
(IPP/SWASTA) D PLTD (DIESEL) 3 - IUKU
(CAPTIVE) G PLTG (GAS) 4 - IUKU
(PSKSK) H PLTG (MINYAK) 5 - IUKS I PLTGU
(GAS) J PLTGU (MINYAK) INSTANSI M PLTM (M
INI HIDRO) 0 - DJLPE (OPERASI/PERPANJANGAN) N PLTN
(NUKLIR) 1 - DJLPE (BARU) P PLTP (PANAS
BUMI) 2 - DINAS (OPERASI/PERPANJANGAN) S PLTS
(SURYA) 3 - DINAS (BARU) U PLTU (BATUBARA)
V PLTU (GAS) W PLTU (MINYAK) X PLTU
(LAIN-LAIN)
20-1989-V01-11-2009 Status izin perpanjangan oleh
DJLPE, milik IPP, tahun mulai operasi 1989, Jenis
PLTU unit 1, bulan dan tahun terbit sertifikat
terakhir Nopember 2009
10
MASA BERLAKU SERTIFIKAT LAIK OPERASIINSTALASI
TENAGA LISTRIK
11
  • TATA CARA PELAKSANAAN
  • SERTIFIKASI LAIK OPERASI
  • KONSUMEN TEGANGAN RENDAH
  • (RUMAH TANGGA)

SUBDIT KELAIKAN TEKNIK DAN KESELAMATAN
KETENAGALISTRIKAN (LANTAI II)
12
SERTIFIKASI INSTALASI KONSUMEN TEGANGAN RENDAH
(RUMAH TANGGA)
  • Dilakukan oleh Lembaga Inspeksi Teknik Nirlaba
    yang ditunjuk oleh Menteri ESDM berdasarakan
    Kepmen ESDM No.1109K/30/MEM/2005 tentang
    penunjukan KONSUIL sebagai lembaga pemeriksa
    instalasi pemanfaatan konsumen tegangan rendah
  • Lembaga Inspeksi Teknik yang di Tunjuk
  • KONSUIL (Komite Nasional Keselamatan Untuk
    Instalasi Listrik)
  • Tugas Melaksanakan pemeriksaan instalasi
    pemanfaatan tenaga listrik konsumen tegangan
    rendah dan menerbitkan Sertifikat Laik Operasi
  • Cakupan Instalasi pemanfaatan konsumen tegangan
    rendah daya 450 s.d 197 kVA

13
DAFTAR ALAMAT KONSUIL
14
Selengkapnya dapat di akses di link
http//www.djlpe.esdm.go.id Home ? Informasi ?
Teknik dan Lingkungan ? Kelaikan Teknik dan
Keselamatan
Ketenagalistrikan
15
KANTOR DIREKTORAT JENDERAL LISTRIK DAN
PEMANFAATAN ENERGI
Gedung Utama
Gedung Annex
  • Jl. H.R Rasuna Said Blok X-2 Kav. 07 dan 08
  • Kuningan Jakarta Selatan 12950
  • Tlp. 021-5225180 Fax. 021-5256044-5256066
  • Tromol Pos 3043/Jkt 10002
  • Direktorat Teknik dan Lingkungan
    Ketenagalistrikan
  • Tlp/Fax. 021-5256034, 021-52920212

16
DAFTAR SNI WAJIB YG DIBERLAKUKAN MENTERI ENERGI
DAN SUMBER DAYA MINERAL
17
DAFTAR SNI WAJIB YG DIBERLAKUKAN MENTERI ENERGI
DAN SUMBER DAYA MINERAL
18
Produk Peralatan dan Pemanfaat Tenaga Listrik
Yang Telah Memperoleh Sertifikat Produk
19
Produk Peralatan dan Pemanfaat Tenaga Listrik
Yang Telah Memperoleh Sertifikat Produk
20
Produk Peralatan dan Pemanfaat Tenaga Listrik
Yang Telah Memperoleh Sertifikat Produk
21
LEMBAGA SERTIFIKASI PRODUK PERALATAN PEMANFAAT
TENAGA LISTRIK
22
LEMBAGA SERTIFIKASI PRODUK PERALATAN PEMANFAAT
TENAGA LISTRIK
23
LEMBAGA SERTIFIKASI PROFESI
24
LSPro DAN LAB UJI PEMANFAAT TENAGA LISTRIK UNTUK
PEMBUBUHAN LABEL TANDA HEMAT ENERGI
25
BADAN USAHA JASA NON KONSTRUKSI YANG SEDANG
PROSES PENUNJUKAN
26
WEB SITE DJLPE
  • Data-data
  • - Regulasi di Bidang Ketenagalistrikan
  • - Lembaga Sertifikasi Produk
  • Lembaga Inspeksi Teknik
  • Daftar Alamat KONSUIL
  • - Merk Produk yang sudah SNI
  • Alamat Kantor Ditjen LPE
  • Tentang Alat Penghemat Daya
  • Tentang Pembangkit Batu Bara
  • Dapat di akses di link
  • http//www.djlpe.esdm.go.id
  • Home ? Teknik dan Lingkungan ? Kelaikan Teknik
    dan

  • Keselamatan Ketenagalistrikan

27
SCHEME FOR PRODUCT CERTIFICATION INDONESIA
28
ELECTRICAL PRODUCT CERTIFICATION PROCEDURE
TIME (DAYS)
TESTING LABORATORY (ACCREDITED)
PRODUCT CERTIFICATION BODY/ LSPro (ACCREDITED)
GOVERNMENT /MEMR
MANUFACTURER/IMPORTER
PRODUCT CERTIFICATION APPLICATION TO LSPro
1
CONTRACT BETWEEN MANUFACTURER AND LSPro
COPY OF PRODUCT CERTIFICATION APPLICATION
1 )
NO
LSPro HAVE TESTING LAB ?
  • CERTIFICATION PROCEDURE
  • PREPARATION OF SNI
  • STIPULATION OF MANDATORY SNI

CONTRACT BETWEEN LSPro AND TESTING LAB
1 )
YES
PRODUCT TESTING AT LSPros TESTING LAB
PRODUCT TESTING
30 )
TECHNICAL SUPERVISION
TEST REPORT EVALUATION FACTORY QUALITY SYSTEM
ASSESMENT
2
PRODUCT REPAIR DUE TO NCR
RE-TEST REQUIRED?
YES
30)
NO
YES
NCR?
NO
COPY OF PRODUCT CERTIFICATE
PRODUCT CERTIFICATE
PRODUCT CERTIFICATE RELEASED
3
Notes ) subject to agreement between
product manufacturer and Product Certification
Body (LSPro) ) subject to agreement
between LSPro and Testing Lab )
subject to product condition )
subject to time required by product manufacturer
to repair product due to Non-Comformity Report
(NCR)
68
TOTAL
29
ELECTRICAL PRODUCT CONFORMITY CERTIFICATION
PROCEDURE
TIME (DAYS)
TESTING LABORATORY (ACCREDITED)
PRODUCT CERTIFICATION BODY/ LSPro (ACCREDITED)
GOVERNMENT /MEMR
IMPORTER
MANUFACTURER
PRODUCT TYPE TESTING
PRODUCT
PRODUCT IMPORT
ACCREDITED BY KAN OR FOREIGN ACCREDITATION BODY
WHICH HAS SIGNED MRA WITH KAN
PRODUCT CONFORMITY APPLICATION TO LSPro
1
CONTRACT BETWEEN IMPORTER AND LSPro
COPY OF PRODUCT CERTIFICATION APPLICATION
1 )
PRODUCT SAMPLING AND INSPECTION
  • CERTIFICATION PROCEDURE
  • PREPARATION OF SNI
  • STIPULATION OF MANDATORY SNI

CONTRACT BETWEEN LSPro AND TESTING LAB
LSPro HAVE TESTING LAB ?
1 )
NO
YES
30 )
PRODUCT TESTING (CRITICAL OR ROUTINE TEST ITEMS
ONLY)
TECHNICAL SUPERVISION
PRODUCT TESTING AT LSPros TESTING LAB
2
TEST REPORT EVALUATION
PRODUCT REPAIR DUE TO NCR
RE-TEST REQUIRED?
YES
30)
NO
YES
NCR?
NO
COPY OF PRODUCT CONFORMITY CERTIFICATE
PRODUCT CONFORMITY CERTIFICATE
PRODUCT CONFORMITY CERTIFICATE RELEASED
3
Notes ) subject to agreement between
product manufacturer and Product Certification
Body (LSPro) ) subject to agreement
between LSPro and Testing Lab )
subject to product condition )
subject to time required by product manufacturer
to repair product due to Non-Comformity Report
(NCR)
68
TOTAL
30
ELECTRICAL PRODUCT CERTIFICATION PROCEDURE
TIME (DAYS)
PRODUCT CERTIFICATION BODY /LSPro (NOT ACCREDITED)
TESTING LABORATORY (NOT ACCREDITED)
GOVERNMENT/ MEMR
MANUFACTURER/IMPORTER
PRODUCT CERTIFICATION APPLICATION TO LSPro
1
CONTRACT BETWEEN MANUFACTURER AND LSPro
COPY OF PRODUCT CERTIFICATION APPLICATION
1 )
NO
  • CERTIFICATION PROCEDURE
  • PREPARATION OF SNI
  • STIPULATION OF MANDATORY SNI

LSPro HAVE TESTING LAB ?
1 )
CONTRACT BETWEEN LSPro AND TESTING LAB
YES
PRODUCT TESTING AT LSPros TESTING LAB
PRODUCT TESTING
30 )
TECHNICAL SUPERVISION
TEST REPORT EVALUATION FACTORY QUALITY SYSTEM
ASSESMENT
2
PRODUCT REPAIR DUE TO NCR
RE-TEST REQUIRED?
YES
30)
NO
YES
NCR?
NO
PRODUCT CERTIFICATE RELEASED
PRODUCT CERTIFICATE
RECOMMENDATION OF PRODUCT CERTIFICATE
3
Notes ) subject to agreement between
product manufacturer and Product Certification
Body (LSPro) ) subject to agreement
between LSPro and Testing Lab )
subject to product condition )
subject to time required by product manufacturer
to repair product due to Non-Comformity Report
(NCR)
68
TOTAL
31
TATA CARA PELAKSANAAN SERTIFIKASI PRODUK
32
SKEMA TATA CARA SERTIFIKASI PRODUK BIDANG
KETENAGALISTRIKAN
WAKTU (HARI)
LABORATORIUM UJI (TERAKREDITASI)
LEMBAGA SERTIFIKASI PRODUK/ LSPro (TERAKREDITASI)
PEMERINTAH /DESDM
PRODUSEN/ IMPORTIR
PERMOHONAN SERTIFIKAT KE LSPro
KONTRAK ANTARA PRODUSEN DAN LSPro
1
SUDAH ADA LAPORAN UJI JENIS?
TEMBUSAN SURAT PERMOHONAN SERTIFIKAT
5
YA
TIDAK
TIDAK
LSPro PUNYA LAB UJI ?
  • Tata Cara Sertifikasi
  • SNI

YA
PENGUJIAN PRODUK DI LAB UJI YANG MEMILIKI MOU
DENGAN LSPro
PENGUJIAN PRODUK DI LAB UJI LSPro
30
PENGAWASAN TEKNIK
EVALUASI HASIL UJI ASESMEN SISTEM MUTU PABRIK
PERBAIKAN LKS
PERLU UJI ULANG
YA
35
TIDAK
YA
ADA LKS
TIDAK
TEMBUSAN SERTIFIKAT PRODUK
SERTIFIKAT PRODUK
PENERBITAN SERTIFIKAT PRODUK
3
74
Catatan kondisi di atas di luar kendala
produsen memenuhi persyaratan standar dan lab uji
melakukan pengujian
TOTAL
33
SKEMA TATA CARA SERTIFIKASI PRODUK BIDANG
KETENAGALISTRIKAN
WAKTU (HARI)
LEMBAGA SERTIFIKASI PRODUK/ LSPro (BELUM
TERAKREDITASI)
PEMERINTAH /DESDM
PRODUSEN/ IMPORTIR
LABORATORIUM UJI (BELUM TERKAREDITASI)
PERMOHONAN SERTIFIKAT KE LSPro
KONTRAK ANTARA PRODUSEN DAN LSPro
1
SUDAH ADA LAPORAN UJI JENIS?
TEMBUSAN SURAT PERMOHONAN SERTIFIKAT
5
YA
TIDAK
TIDAK
LSPro PUNYA LAB UJI ?
  • Tata Cara Sertifikasi
  • SNI

YA
PENGUJIAN PRODUK DI LAB UJI YANG MEMILIKI MOU
DENGAN LSPro
PENGUJIAN PRODUK DI LAB UJI LSPro
30
PENGAWASAN TEKNIK
EVALUASI HASIL UJI ASESMEN SISTEM MUTU PABRIK
PERBAIKAN LKS
PERLU UJI ULANG
YA
35
TIDAK
YA
ADA LKS
TIDAK
PENERBITAN SERTIFIKAT PRODUK
SERTIFIKAT PRODUK
EVALUASI REKOMENDASI PENERBITAN SERTIFIKAT
PRODUK
5
76
Catatan kondisi di atas di luar kendala
produsen memenuhi persyaratan standar dan lab uji
melakukan pengujian
TOTAL
34
SKEMA TATA CARA SERTIFIKASI KESESUAIAN PRODUK
BIDANG KETENAGALISTRIKAN
WAKTU (HARI)
LABORATORIUM UJI (TERAKREDITASI)
LEMBAGA SERTIFIKASI PRODUK/ LSPro (TERAKREDITASI)
PEMERINTAH/DESDM
IMPORTIR
PRODUSEN
PENGUJIAN JENIS/TIPE PRODUK
PRODUK
PRODUK IMPOR
PERMOHONAN SERTIFIKAT KESESUAIAN PRODUK KE LSPro
1
KONTRAK ANTARA IMPORTIR DAN LSPro
TEMBUSAN PERMOHONAN SERTIFIKAT KESESUAIAN PRODUK
1
PEMERIKSAAN DAN PENGUJIAN CONTOH PRODUK
  • TATACARA SERTIFIKASI
  • PERUMUSAN SNI
  • PENETAPAN SNI WAJIB

KONTRAK ANTARA LSPro DAN LAB UJI
TIDAK
LSPro PUNYA LAB UJI ?
YA
30
PENGUJIAN PRODUK (UJI KRITIKAL ATAU UJI RUTIN)
PENGAWASAN TEKNIS
PENGUJIAN PRODUK DI LAB UJI LSPro
2
EVALUASI HASIL UJI
PERBAIKAN LKS
PERLU UJI ULANG?
YA
30
TIDAK
YA
LKS?
TIDAK
COPY SERTIFIKAT KESESUAIAN PRODUK
SERTIFIKAT KESESUAIAN PRODUK
PENERBITAN SERTIFIKAT KESESUAIAN PRODUK
3
67
TOTAL
Catatan kondisi di atas di luar kendala
produsen dan Importir memenuhi persyaratan
standar dan lab uji melakukan pengujian
35
SKEMA TATA CARA SERTIFIKASI KESESUAIAN PRODUK
BIDANG KETENAGALISTRIKAN
WAKTU (HARI)
LABORATORIUM UJI (BELUM TERAKREDITASI)
LEMBAGA SERTIFIKASI PRODUK/ LSPro (BELUM
TERAKREDITASI)
PEMERINTAH/DESDM
IMPORTIR
PRODUSEN
PENGUJIAN JENIS/TIPE PRODUK
PRODUK
PRODUK IMPOR
PERMOHONAN SERTIFIKAT KESESUAIAN PRODUK KE LSPro
1
KONTRAK ANTARA IMPORTIR DAN LSPro
TEMBUSAN PERMOHONAN SERTIFIKAT KESESUAIAN PRODUK
1
PEMERIKSAAN DAN PENGUJIAN CONTOH PRODUK
  • TATACARA SERTIFIKASI
  • PERUMUSAN SNI
  • PENETAPAN SNI WAJIB

KONTRAK ANTARA LSPro DAN LAB UJI
TIDAK
LSPro PUNYA LAB UJI ?
1
YA
30
PENGUJIAN PRODUK (UJI KRITIKAL ATAU UJI RUTIN)
PENGAWASAN TEKNIS
PENGUJIAN PRODUK DI LAB UJI LSPro
2
EVALUASI HASIL UJI
PERBAIKAN LKS
PERLU UJI ULANG?
YA
30
TIDAK
YA
LKS?
TIDAK
PENERBITAN SERTIFIKAT KESESUAIAN PRODUK
SERTIFIKAT KESESUAIAN PRODUK
REKOMENDASI PENERBITAN SERTIFIKAT KESESUAIAN
PRODUK
3
68
TOTAL
Catatan kondisi di atas di luar kendala
produsen dan Importir memenuhi persyaratan
standar dan lab uji melakukan pengujian
36