Diapositiva 1 - PowerPoint PPT Presentation

1 / 19
About This Presentation
Title:

Diapositiva 1

Description:

THE INITIAL LEGAL ACTION WAS QUALIFIED AS IMPROCEDENT BUT AN APPEAL IS UNDER WAY. ... the country and the most important Burle Marx work outside his country, Brasil. ... – PowerPoint PPT presentation

Number of Views:59
Avg rating:3.0/5.0
Slides: 20
Provided by: stoddarth
Category:

less

Transcript and Presenter's Notes

Title: Diapositiva 1


1
Generalísimo Francisco de Miranda Park
(2008) Parque del Este Rómulo Betancourt
(1984) Parque del Este (1961)
Buildt between 1957 and 1962 - project by
Roberto Burle Marx and Team
2
  • Aereal view of Lake 9
  • (recent)

3
Intervention area 8.620,00 mts2
4
(No Transcript)
5
HEIGHT 36 Mts. a nine to ten floor building
Image created to promote the project
PROYECTO LEANDER. El barco de la libertad (Buque
y museo mirandino) Parque del Este,
Caracas
6
PROYECTO LEANDER. El barco de la libertad (Buque
y museo mirandino)
Corte longitudinal
7
PROYECTO LEANDER. El barco de la libertad (Buque
y museo mirandino)
Corte longitudinal
8
PROYECTO LEANDER. El barco de la libertad (Buque
y museo mirandino)
Corte transversal
9
AREAS (m²)
Museum and service areas de museo y servicios
3.131,73 m² Ship area
839,7
m² Total Construction Area 3.971,43 m²
PROYECTO LEANDER. El barco de la libertad (Buque
y museo mirandino)
Áreas
10
SVAP (VENEZUELAN SOCIETY OF LANDSCAPE
ARCHITECTSHAS BEEN APPROACHED BY A GROUP OF
CITIZENS WHO PROTESTED LEGALLY REQUESTING OUR
ASSISTANCE IN THIS QUEST.THE INITIAL LEGAL
ACTION WAS QUALIFIED AS IMPROCEDENT BUT AN APPEAL
IS UNDER WAY. THE NATIONAL HERITAGE OFFICE HAS
DECLARED THIS INTERVENTION AS MINOR AND GIVEN
PERMISSION STATING THAT NO DAMAGE WILL BE
DONE.NO MENTION TO THE MANAGEMENT PLAN DONE IN
2003..
11
THE MEMBERS OF SVAP REQUEST THE
FOLLOWING 1-THAT THE WORKS BE INMEDIATELY
STOPPED 2-THAT THIS PROJECT MOVES OUTSIDE THE
PARK 3-THAT A RECUPERATION PROJECT OF THE PARK
HAS TO BE SERIOUSLY UNDERTAKEN 4. THE LEANDER
PROJECT CONSISTS IN A SUBTERRANEAN TWO STORY
BUILDING OF 4000 SQ.METERS, THAN ENDANGERS THE
INTEGRITY OF THE LAKE, IS AN UNREVERSIBLE
INTERVENTION THAT WILL AFFECT MUCH MORE THAN THE
APPROX. 8000SQ. METRES OF PARK TERRITORY THAT WE
CAN SEE IN THE GRAPHIC ILUSTRATING THIS ISSUE.
12
5..THIS PROJECT WILL NEED PUMPS FOR THE
UNDERWATER EXTRACTION, VENTILATION AND AIR
CONDITIONING INSTALLATIONS, MOST OF THEM ON
GROUND LEVEL, AND NOISE PRODUCING, IN THE UNTIL
TODAY QUIETEST AREA OF THE PARK. 6.THE PROJECT
IS LOCATED NEARLY 800M FROM THE MAIN ENTRANCE,
TRANSFORMING THE PARK INTO A SERVICE AREA OF THIS
PROJECT 7. THE PARK HAS BEEN SERIOUSLY
UNDERMANTAINED, MAKING IT EVIDENT THAT THE PRK
INSTITUTE HAS POOR CAPACITY TO UNDERTAKE A NEW
AND HIGHLY DEMANDING UNSUSTAINABLE FACILITY.
8.THIS PROJECT HAS NOT BEEN PRESENTED TO THE
RELATED COMUNITIES FOR CONSULTATION
13
Aprox. 800 mts
The project is located nearly 800M from the main
entrance, transforming the PARK into a SERVICE
AREA of the Project
Aprox. 200 mts
14
PARQUE DEL ESTE Decalared as a NATIONAL HERITAGE
SITE July, 13Th 1998190-acre
15
The values that were identify to be declared as
National Heritage site
  • As the best example of landscape arquitecture in
    the country and the most important Burle Marx
    work outside his country, Brasil.
  • From an aestethic view, it acomplish armonic
    spaces, a high quality landscape and botanical
    ambiances and the presence of tropical flora.
  • From the funtional point of view, there is a
    physical infaestructure dedicated to the
    recreational activity and the presence of
    buildings as the Planetarium, La Concha Acústica
    and the Nao Santa Maria.

16
The Park today
17
Investment 2006
  • A 8M Bs. F investment is been concentrated on 2.5
    of the Park total the total area.
  • Only a 14M Bs. F investment will be use for the
    rest of Parque and Parque del Oeste.
  • (Information took from INPARQUES web page).

18
  • The Project was created without the comunity and
    experts participation (2006-2008)
  • The IPC (Cultural Heritage Institute) authorized
    the Project on August, 15th. More than a month
    after works started. And 10 days later the legal
    action started.
  • (Information given by IPC on the Court on August,
    21th 2008).

19
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com