E911 Provisioning - PowerPoint PPT Presentation

1 / 32
About This Presentation
Title:

E911 Provisioning

Description:

... (CSR) enter these customer data into SBC(AT&T) site. ... Sending file to SBC (AT&T) Updating Records in Compass. Receiving file from SBC. Process ... – PowerPoint PPT presentation

Number of Views:79
Avg rating:3.0/5.0
Slides: 33
Provided by: Pram2
Category:
Tags: att | e911 | provisioning

less

Transcript and Presenter's Notes

Title: E911 Provisioning


1
E911 Provisioning
  • Presented By
  • Pramodh Vakati.
  • Mentor Reddy Parlapalli.
  • Company Telnet World Wide Inc.

2
Overview
  • Introduction
  • Existing System
  • Purpose of the Project
  • Software's used
  • Flow chart
  • Main modules of the Project
  • Implementation of the system
  • Design of Tables
  • Conclusion

3
Introduction
  • 911 Provisioning
  • E911 Provisioning

4
Existing System
  • Customers enter data into Telnet Site
  • Customer Sales Representatives (CSR) enter these
    customer data into SBC(ATT) site.
  • SBC then send the status of the files.
  • Depending on status of the file further
    processing is done.

5
Disadvantages of the Existing System
  • Much Human intervention is needed
  • CSRs time is wasted
  • Errors occurred due to manual entry
  • More Processing time for an order is required.

6
Purpose of E911 Provisioning
  • Automates the process of sending customers data
    from Telnet to SBC
  • Can Reduce Manual intervention in sending
    customers data
  • Can Reduce the time required for processing an
    order

7
Softwares Used
  • Microsoft Visual Studio.NET 2003 Enterprise
    Edition
  • Microsoft SQL Server 2000
  • ASP.Net

8
Flow Chart
9
Main modules of the Project
  • Extract Data From Compass
  • This step involves exporting the E911 data
  • in Compass to a file format that SBC
    desires.
  • Submit Data to SBC
  • This step involves sending the file
  • generated in the earlier step to SBC.
  • Receive Data from SBC
  • Every file sent to SBC is processed and a
  • new status file is sent back to
    Compass. The
  • third step validates the data
    received from
  • SBC and updates the status of
    information in
  • Compass.

10
Implementation of the system
  • Add/Change/Disconnect E911 Records.
  • Confirm the Records.
  • Check the Status of the Records.
  • Manage the Rejected Records.

11
Add E911 Records.
  • In the E911 Ordering Page there are two sections
    of phone numbers. The first section shows the
    phone numbers (E911 Records) for this order and
    the second section shows the unassigned phone
    numbers. The first time an order is placed all
    the phone numbers will be in the unassigned
    section and they will be gradually pushed into
    the E911 entries section.

12
  • In order to add a single phone number as an E911
    Record into Compass the user can click the Add
    Button beside the phone number in the unassigned
    section. Once the phone number is added the
    Record will be shown in the E911 entries section
    with a status of Pending.
  • In order to add multiple phone numbers select
    them by clicking the check boxes beside them and
    click the Add Button in the Header of the Data
    Grid.

13
(No Transcript)
14
Change E911 Records
  • The Record that needs to be changed should be in
    the E911 entries section.
  • Click the Edit button in the Data Grid. After
    making the changes click the update button. This
    will update the status of the Record to Pending

15
Disconnect E911 Records
  • If the user wishes to exclusively remove the E911
    Record from an order Click the Delete Button and
    a disconnect Record is sent to SBC and the status
    is updated to Pending and the phone number is
    added to the available phone numbers bucket.

16
  • In the Status Dropdown List select Pending and
    click the Go Button to see the list of E911
    Records which are Pending and are ready to be
    sent.
  • If the above three steps(Add/Edit/Delete) have
    been carried successfully then the Record should
    be appearing in the Pending List of Records.
  • If the Record appears in the list, it remains in
    the Pending status until the ISD is set. The
    column ISD should give an indication whether the
    order is closed or not.
  • Once the ISD is set the Record will be sent
    within the same business day to SBC and the
    status of the Record will change to Submitted.
    The Sent Date (SDate) will be filled.

17
(No Transcript)
18
(No Transcript)
19
Check the Status of the Record
  • The next business day (the day after the Record
    is sent) check the status of the Record Sent.
  • If the status of the Record is Accepted then the
    process is successful.

20
(No Transcript)
21
Manage the Rejected Record
  • A Record could be rejected for multiple reasons.
    The reason for rejection and the Error Code is
    specified in the Message column of the Data Grid.
  • If the rejected Record was either add/change then
    click the phone number in the Data Grid and it
    will launch the E911 Ordering page.
  • If the Error Code is 792 it means that the phone
    number is not yet released by the previous
    company and within 7 days SBC will update the
    status accordingly.

22
(No Transcript)
23
Error Codes Description
  • Below are the some of error codes that are used
    to indicate the reason for which a particular
    order got rejected.
  • 000 Record accepted
  • 105 Name missing
  • 107 House number is invalid
  • 709 Street not found
  • 999 Record has not been sent

24
Design of Database
25
Order_PhoneNumber_E911 Table Design
26
Order_PhoneNumber_E911_Cycle Table Design
27
Order_PhoneNumber_E911_ErrorCodes Table Design
28
ORDER_PHONENUMBER-E911 E911 ID - Unique key
which stores E911 number for a particular
order PID Phone ID FIRST NAME -
first name LASTNAME - last name ADRESS -
Address CITY - city ZIP
- zip code OIDSTART - Order Start
Date OIDEND - Order End Date RBOC
Field which denotes wire line
providers i.e. either SBC or Verizon.
ERRORCODE - can stores the error code
values. STATUS can store one of
the four values Accepted , Submitted,
Pending and Rejected LDATE -
Loaded Date SDATE- Submitted
Date ADATE Accepted Date
29
ORDER_PHONENUMBER-E911_CYCLE ID
- Cycle number CYCLE_SBC - stores
1 if cycle belongs to SBC else stores
0 CYCLE_VERIZON stores 1 if cycle belongs to
Verizon else
stores 0
30
ORDER_PHONENUMBER-E911_ERROR ID
Error Id ERROR CODE error code MESSAGE
Message corresponding to the error
code.
31
Conclusion
  • In today's world productivity can be achieved
    from automation. Every task has to be done
    easily and effectively. Manual Intervention has
    to be reduced as much as possible.
  • I have done E911 provisioning which automates
    sending customer data to SBC site. This
    automation of process saves lot of customers
    sales representatives time.

32
  • Thank You
Write a Comment
User Comments (0)
About PowerShow.com