Title: Fargo Flood Control
1Fargo Flood Control Southside
Flood Protection Chrisan East Subdivision
Public Meeting August 26, 2008
276th Avenue
Cass Co Hwy 81
1997 Spring Flood South of Fargo
3West Fargo
Fargo
Southside Flood Control
Chrisan East - Existing 100 yr Floodplain
Horace
4West Fargo
Fargo
Southside Flood Control
Chrisan East - Preliminary 100 yr Floodplain
Horace
5West Fargo
Fargo
Southside Flood Control
Chrisan East Existing and Preliminary 100
yr Floodplains
Horace
6Background Activities
- Previous Public Involvement
- March 2008 (Public Meeting)
- June 2008 (Public Meeting)
- August 5, 2008 (Site Staking)
- Options Considered (Prelim. Design and Soils)
- Full Protection (Option 1A/B/C/D)
- Partial Protection (Option 2A/2B)
- Request for Comments/Questionnaire (8/6/2008)
- 26 of 35 Returned (Thru 8/25/08)
- Technical Team Recommendation
- Full Protection - Option 1D
7Chrisan East Subdivision
- Option 1D Full Levee
- Components
- Earthen Levee (BFE3)
- 12 Property Acquisitions
- 20 Structures Protected
- Project Costs
- Construction 851,000
- Real Estate 3,064,000
- Total 3,915,000
8(No Transcript)
9Chrisan East Subdivision
Landowner Comment Project Options
10Chrisan East Subdivision
Landowner Comment Project Options
11Chrisan East Subdivision
Landowner Comment Project Options
12Chrisan East Subdivision
Cost Estimate
13Chrisan East Subdivision
Landowner Comment Funding Scenarios
- Funding Scenario 1
- 50 State of North Dakota,
- 25 City of Fargo,
- 25 Chrisan (Special Assessment).
- Under this option, the 25 cost share per
remaining home for the full protection options
would range from 30-50,000. - Funding Scenario 2
- Request for Future Annexation to City of Fargo.
Under this option assessments would be determined
using the same calculation proposed for
properties currently in the City of Fargo.
Currently this is estimated to be approximately
4,500 to 5,000 per home.
14(No Transcript)
15Chrisan East Subdivision
Cost Estimate
(1) Based on an estimated 4750 per home that
is protected.
16Annexation
- Property owners must petition for annexation.
- Agreement will be drafted.
- Possible Terms of agreement
- Deferral Period (Petitioners may not protest
annexation after deferral period) - Flood Protection funding
- Must be approved by City Commission.
17Project Schedule
18Southside Flood Control
Questions / Discussion
19Additional Information
20Assessed Value / Lot Size
21Fargo
Moorhead
Interstate 29
Rose Coulee
Frontier
25th Street South
Red River
Cass Co Hwy 81
Wild Rice River
1997 Spring Flood South of Fargo
22Fargo
Interstate Hwy 94
West Fargo
Southside Flood Control
Moorhead
Preliminary 100 Year Floodplain
Horace
Interstate Hwy 29
Oxbow
23Fargo
Interstate Hwy 94
West Fargo
Southside Flood Control
Moorhead
After Project Preliminary 100 Year
Floodplain With Internal 100 Year Floodplain
Horace
Interstate Hwy 29
Oxbow
24Southside Flood Control
- Provide Protection from overland flooding that
threatens the majority of properties south of
I-94. - Prevent extensive expansion of South Fargo
Floodplain and mandatory flood insurance
requirement. - Provide growth area for Fargo, helping to keep
our regions economy healthy
25Project Flood Control Methods
- FEMA levees with and without diversion channels
- Channel extensions
- (Red River drain improvements)
- Storage inside of project
- Storage in upstream watershed
26Southside Flood Control
STORAGE SUMMARY Existing effective storage
6,000 Acre-Ft Base project 0
Acre-Ft Channel extension/storage 2,000
Acre-Ft Supplemental storage 4,000
Acre-Ft Upstream dams 75,000 Acre-Ft (External
storage)
STORAGE
27(No Transcript)
28(No Transcript)
29- Typical Chrisan East - 4,500-5,000/home
- 150-200K (Approximately 1 ac)
30(No Transcript)
31Southside Flood Control
Wild Rice Levee Option Including Mini-Bypass
Alternative
32Southside Flood Control
Levees east of Cass Co. Hwy 81