WG3 Presentation to SC4 Closing Plenary - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

WG3 Presentation to SC4 Closing Plenary

Description:

Goult, Ray J LEADER. T04 Materials. Moreno, Anna LEADER. Swindells, Norman DEPUTY ... Tape Laying for composites. Rapid Prototyping. 2006-10-27. ISO TC184/SC4 ... – PowerPoint PPT presentation

Number of Views:25
Avg rating:3.0/5.0
Slides: 18
Provided by: geraldm65
Category:

less

Transcript and Presenter's Notes

Title: WG3 Presentation to SC4 Closing Plenary


1
WG3 Presentation to SC4 Closing Plenary
  • Gerald Radack, Convener
  • Hershey, Pennsylvania, USA
  • 2006-10-27
  • Revision 1 2006-10-27

2
Plenaries in Funchal
  • Monday 1030-1200
  • Thursday 1300-1500

3
Teams
  • T01 Shape Representation
  • Goult, Ray J LEADER
  • T04 Materials
  • Moreno, Anna LEADER
  • Swindells, Norman DEPUTY
  • T08 Product Life Cycle
  • King, Timothy LEADER
  • URen, Jim DEPUTY
  • T09 Engineering Analysis
  • Hunten, Keith LEADER
  • T10 Electrical/Electronics
  • Klein, Lothar LEADER
  • Thurman, Thomas R DEPUTY
  • T19 Mechanical Products
  • Ungerer, Max LEADER
  • T22 Building and Construction
  • Haas, Wolfgang LEADER
  • Terai, Tatsuo DEPUTY
  • Kim, Inhan DEPUTY
  • T23 Ships
  • Barter, Mike LEADER
  • Mays, James L LEADER
  • T24 Manufacturing
  • Hardwick, Martin LEADER
  • Sakamoto, Chiaki DEPUTY
  • T25 Oil, Gas, Process and Power
  • Sandsmark, Nils LEADER
  • van Exel, Paul DEPUTY

4
T01 Shape Representation
  • Accomplishments in Hershey
  • Reviewed 150 early CD ballot comments on Part 54
    (PDQ-Shape) resolved many
  • Reviewed draft construction history geometry
    modules for AP 203 ed 2
  • Joint meetings with WG12 Parametrics, T22 and IAI

5
T01 Shape Representation
  • Plans for Funchal
  • Part 59 ballot resolution workshop
  • Ballot closes 2006-12

6
T04 Materials
  • Plans between now and Funchal
  • AP 235 DIS
  • Submit for convener review 2006-11-30
  • Submit for CD ballot 2006-12-31
  • Plans for Funchal
  • Discuss DEPUIS project
  • AP 235 DIS early comment review

7
T08 Product Life Cycle
  • Accomplishments in Hershey
  • determined scope of required work to deliver CD
  • introductions written in domain language
  • Plans between now and Funchal
  • complete select resolution mapping by end of
    February at latest (earliest end of 2006-11)
  • Plans for Funchal
  • review early comments

8
T09 Engineering Analysis
  • Accomplishments in Hershey
  • Reviewed Parts 52 and 53 ballot issues and
    EXPRESS errors found during AP 209 e2 creation
  • Attended EXPRESS Binary Data Project
  • Updated the AP 209 e2 planning diagram
  • Discussed strategy for including STEP-TAS and NRF
    capabilities in AP 209 e2
  • Discussed work and review strategy
  • Met with Systems Engineering AP 233
    representatives
  • Finalized the Analysis modules shared between AP
    233 and AP 209 e2

9
T 23 Ships
  • Accomplishments in Hershey
  • Joint T24/T23, Manufacturing, agreement to
    collaborate on AP 218 and AP 238 evolution
  • Joint T22/T23 SEDS resolution workshops held for
    AP 227 e2
  • SEDS resolution workshops held for APs 215, 216,
    and 218
  • Discussed Parts Library standards
  • Discussion on eMSA and NSRP collaboration in
    future efforts
  • WG12 SED discussion on geometry relationships
    across APs

10
T 23 Ships
  • Plans for Funchal
  • Ship team meeting plan in discussion
  • NSRP pilot project development anticipated
  • T10 joint meeting desired (AP 212)
  • T8 joint meeting desired (APs 233, 239), OASIS
    and implementer involvement desired

11
T24 Manufacturing
  • Accomplishments in Hershey
  • Joint meeting with Shipbuilding on plate cutting
  • Review of AP 223 Castings
  • ISO Industry Day meeting with Automotive and
    Aerospace Metrology industry
  • 50 attendees
  • Joint meeting with SC1/WG7
  • Decided that in future new work items shall be
    submitted simultaneously for ISO 14649 and AP 238
    by SC1 and SC4
  • AP 219 (CMM) DIS ballot workshop

12
T24 Manufacturing
  • Edition 2 ideas
  • AP 240
  • Nesting
  • Grinding
  • Tape laying
  • AP 238
  • Contouring, Marking
  • Grinding
  • Traceability
  • Tape Laying for composites

13
T24 Manufacturing
  • Plans for Funchal
  • Joint meeting with SC1/WG7
  • IMS project plans
  • Further industry discussions (QMD etc.)
  • Initiate new work items
  • Machine tool model
  • Contour cutting
  • Traceability
  • Tape Laying for composites
  • Rapid Prototyping

14
T25 Oil, Gas, Process and Power
  • Accomplishments in Hershey
  • Resolved the last outstanding ballot issues for
    ISO 15926-4 CD/TS and agreed requirements and
    plan for publication
  • Discussed the documents for SC4 MA for reference
    data, i.e. technical and business annexes for ISO
    15926-3 and ISO 15926-4
  • Developed technical requirements for SC4 MA for
    ISO 15926-4 reference data
  • Reviewed NWI-CD/TS proposal of ISO 15926-6
  • Reviewed status ballot ISO 15926-7 CD/TS and
    discussed proposed issue resolutions.
  • Discussed NWIs for Change Management review for a
    PWI for Process Monitoring Data

15
T25 Oil, Gas, Process and Power
  • Plans between now and Funchal (1)
  • Complete the test example for AP 221 and send it
    to WG3 convener
  • The complete AP 221 package for IS publication
    ready for convener sign-off by 2006-12-15
  • Send revised ISO 15926-3 CD/TS document to WG3
    convener for approval for publication as TS by
    2006-12-31
  • Possibly reference data as an electronic insert
  • Complete ballot issues resolution of ISO 15926-4
    and send revised document to WG3 convener for
    approval for publication as TS by 2006-12-15
  • Possibly reference data as an electronic insert
  • Progress business and technical annexes for ISO
    15926-3/4 for SC4 MA for reference data

16
T25 Oil, Gas, Process and Power
  • Plans between now and Funchal (2)
  • Complete NWI/CD/TS proposal documents for WG3
    convener review for ISO 15926-6 Scope and
    methodology for developing additional reference
    data
  • Complete ballot issues resolution for ISO 15926-7
    TS and conversion to OWL for WG3 convener review
  • Complete the comparison study on ISO 15926-7,
    Gellish Tables, AEX methodology, XMpLant, and NE
    100
  • Prepare NWI proposal for Gellish Table for Change
    Management review, depending on outcome of study
    report

17
T25 Oil, Gas, Process and Power
  • Plans for Funchal
  • Discuss requirements for a second edition of ISO
    15926 parts 1 and 2
  • Review status of ISO 15926-6 TS
  • Present proposed ballot comment issues
    resolutions of ISO 15926-7 TS
  • Present conclusions of the comparison study on
    ISO 15926-7, Gellish Tables, AEX methodology,
    XMpLant, and NE 100 with conclusions and
    implications for ISO 15926
  • Finalise documents SC4 MA for reference data i.e.
    technical and business documents inclusive annex
    for ISO 15926-3/4
  • Present NWI for Gellish Table for Change
    Management review, depending on outcome of
    comparison study
Write a Comment
User Comments (0)
About PowerShow.com