An Introduction to TTA Standardization Activities - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

An Introduction to TTA Standardization Activities

Description:

Supporting higher peak data rates (DL 100 Mbps, UL 50 Mbps) ... Seamless connectivity. High system efficiency. Full mobility support. Enhance user device ... – PowerPoint PPT presentation

Number of Views:26
Avg rating:3.0/5.0
Slides: 9
Provided by: tta2
Category:

less

Transcript and Presenter's Notes

Title: An Introduction to TTA Standardization Activities


1
Proposed Working Methods on Phase 1 Collaboration
The 7th CJK B3G Standards Meeting 8 December
2004, Beijing, China TTA
Telecommunications Technology Association
2
Contents
  • CJK Timeframe Overview
  • 3GPP RAN Evolution Workshop
  • Common Requirements
  • Proposals for evolution
  • Proposed Working Methods on Phase 1
  • Collaboration

3
CJK Timeframe
It is time to initiate discussion for Phase 2
4
3GPP RAN Evolution Workshop Common Requirements
  • Reduce the cost per bit by improving the
    spectrum efficiency (24 times of Rel6)
  • Improved service provisioning by
  • Reducing the set up and round trip delay
  • Supporting higher peak data rates (DL gt 100
    Mbps, UL gt 50 Mbps)
  • Enhancing the data rate for MBMS (1 3 Mbps)
  • Flexible use of existing and new frequency bands
    by
  • Wider bandwidth than 5 MHz, typically, up to 20
    MHz or more
  • Allowing variable duplex technology within bands
    and between bands
  • Non-contiguous spectrum allocations to one UE
    should not be precluded
  • Architecture and mobility enhancements by
  • Separating each entities in UTRAN for an open
    architecture (Multi vendor)
  • Supporting multi-RAT with resources controlled
    from the network

5
3GPP RAN Evolution Workshop Proposals for
evolution
  • Smooth introduction of 3G Evolution
  • Rapid progress of standardization process

6
Proposed Working Methods on Phase 1
Collaboration - Methodology
  • Phase 1 Contents (Execution Stage 1 common
    understanding)
  • Item 1) Service requirement
  • Item 2) Service scenario
  • Keep going Information Exchange on ITU-R WP8F
    Service/Market Questionnaire
  • Item 3) Spectrum issues
  • Keep going Information Exchange on ITU-R WP8F
    Spectrum Calculation Methodology
  • Due Date March 2005, if necessary, after March
    2005 (ITU-R WP8F)
  • Item 4) Identifying technical areas of interest
  • Item 5) Identifying technical issues
  • Make a core component technology list for joint
    technical discussion of Phase 2
  • Consider technical issues of 3GPPs and so on
  • Due Date 2005. 3 (The 8th CJK
    B3G Standards Meeting)

7
Proposed Working Methods on Phase 2
Collaboration - Example of Item 4 5
8
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com