US Silicon Tracker group - PowerPoint PPT Presentation

About This Presentation
Title:

US Silicon Tracker group

Description:

guarded chuck, Semi-Auto. Microscope Mitutoyo 2x 10x 20x, 10x ... Vibration-free table Kinetics 1201. Custom made dark box. October 7, 2003 ... – PowerPoint PPT presentation

Number of Views:32
Avg rating:3.0/5.0
Slides: 22
Provided by: sko5
Category:

less

Transcript and Presenter's Notes

Title: US Silicon Tracker group


1
Quality Assurance Test Stand University of
Rochester
  • QTC at Rochester, NY
  • Whats new compared to KSU
  • Vacuum Base Chuck Positioner
  • Extra switch to decouple guard box
  • Test crosscheck
  • 5 Test Structures
  • Tested by Vienna, Karlsruhe QTC
  • 2 OB2 sensors
  • Tested by Perugia QTC
  • Handling the results
  • Data Base
  • Conclusion, plans

2
Setup is completed
  • Hardware is in place and operational.
  • Software is working as well, - test results are
    consistent with other testing centers (more
    details later).
  • Clean room is to be completed by 20th of October.

3
Personnel
  • Regina Demina (585) 275-7357
  • Thomas Ferbel (585) 275-4396
  • Elizabeth A. Groves (585) 275-4001
  • Sergey Korjenevski (585) 275-8550
  • David R. Martell (585) 275-5938
  • Daniel Schwaab (585) 275-4394

4
List of the Equipment
  • Probe Station Alessi REL-6142 8 in. guarded
    chuck, Semi-Auto
  • Microscope Mitutoyo 2x 10x 20x, 10x
  • Vacuum base positioners with 4 coax probes
  • Needles diameter 5 ?m
  • LCR HP 4284A
  • V-source/Ammeter Keithley 237 and Keithley 487
  • Switching Matrix Agilent 34970A with two 8x4
    switch 34904A
  • Vibration-free table Kinetics 1201
  • Custom made dark box

5
New Features
  • Solid stable location of the chuck positioner.
  • Significant to ensure safety and helps to
    minimize noise

6
New Features
  • New switch is added to discharge decoupling
    capacitors.
  • Significant to ensure safety and helps to
    minimize noise.

7
Cross Check, - Full strip tests
  • Two OB2 sensors, ST, tested by Perugia
  • 30210420275924
  • 30210414739923
  • 5 Test Structures, HPK
  • 60548-050 from Karlsruhe
  • 60548-051 from Karlsruhe
  • 60549-055 from Vienna
  • 60550-065 from Vienna
  • 60551-087 from Vienna

All these were retested at UofR. Results are in
very good agreement.
8
IV Test
9
IV Test
10
CV Test
11
CV Test
12
Strip tests - Leakage
13
Strip tests - Leakage
14
Strip tests - Rpoly
15
Strip tests - Rpoly
16
Strip tests - Cac at 100Hz
17
Strip tests - Cac at 100Hz
18
Strip tests - Idiel
19
Strip tests - Idiel
20
Data Base
  • We were not able to simulate data handling with
    fictitious names though we believe our .xml
    format is correct. The problem may disappear as
    we proceed with real actions.
  • Error 
  • DB ERROR fatal error 0RA-02291 integrity
    constraint (CMSTRKDB.REF_INPUT14) violated
    parent key not found
  • ORA-06512 at CMSTRKDB.STORED_FUNCTIONS, line
    788
  • ORA-06512 at line 1
  • error goes on to list the text in the file. It
    is not just IV_TEST in particular. If this test
    is deleted and it goes straight to CV, the
    problem basically is repeated.

21
Conclusions and Plans
  • QTC at University of Rochester complies with CMS
    requirements to test Si detectors.
  • Rate of the testing is estimated to be 2 OB2
    sensors per day.
  • Data Base remains an issue. The problem may
    disappear if everything is done in proper order
    using appropriate bar codes and all.
Write a Comment
User Comments (0)
About PowerShow.com