Subcontracting Subcontractors 75 -85 % of work is subbed Significant impact on costs and schedule Want to develop a working relationship with good subs Subs must do ... – PowerPoint PPT presentation

Number of Views:362
Avg rating:3.0/5.0
Slides: 11
Provided by: andreww45
Category:

less

Transcript and Presenter's Notes

Title: Subcontracting


1
Subcontracting
2
Subcontractors
  • 75 -85 of work is subbed
  • Significant impact on costs and schedule
  • Want to develop a working relationship with good
    subs
  • Subs must do good on time work
  • GC must pay subs to keep them viable

3
Scope of Work
  • Description of work to be performed
  • List of specific scope items to be included
  • List of items which are excluded
  • Can be construction only or include design
  • Action words are used to define clearly subs
    responsibilities provide, install
  • Pg 93 scope
  • PM must make sure all work items to be subbed are
    included in scope

4
Subcontract Documents
  • Subcontract record of agreement btween GC and
    sub
  • Topics pg 94
  • Appendix G

5
Subcontractor Prequalification
  • Experience and tech skills required
  • Tech and supervisory competency of management and
    field supers
  • Stability and financial strength
  • Adequacy of specialized equipment
  • Past safety performance
  • Reputation for working cooperatively, past
    project performance, warranty performance

6
Selection
  • Invite top 5 -6 subs to submit bid
  • Done with a request for quotation
  • F 8-2 8-3
  • Cannot bid shop
  • Evaluate bids
  • Unrealistically low or high bids
  • unsure of scope
  • Found ambiguities
  • Erred when preparing quote
  • Omitted items
  • High bid -gt doesnt need work

7
Selection
  • Dont need performance or payment bonds from subs
    when selection is based on technical competence,
    reputation, financial condition
  • Do when it is public low bid project

8
Sub Management
  • PM and supers work to schedule and coordinate
    subs to get project done
  • Proof of insurance before sub is on site
  • Need to mold subs into cohesive group
  • Need to know concerns, proper work sequencing
  • Open communications with subs and foremen
  • Get a daily report from each sub
  • Progress, obstacles
  • Need to provide adequate notice to subs

9
Sub Management
  • Jobsite needs to be ready for sub
  • Preconstruction meeting
  • F 8-6
  • Mock-ups from subs show work quality before
    actual work is done
  • Subs cannot build over substandard work of other
    subs
  • Do a walk thru when sub is done and note areas
    that need reworking

10
Sub Management
  • Need communications system for subs to get
    problems resolved in field
  • Log questions and answers in
  • Change orders
  • F 8-8, 8-9
  • PM signs off on payment request
  • F 8-11
  • Must get final lien waiver before final payment
    is sent