Title: Bild 1


1
Thesis work Verification of connection
requirements for wind farms
  • A new Grid Code is under development in the EU.
    Entso-e that is working on the new requirements
    has announced that only small changes of the
    current draft are to expect. The new Grid Code
    will result in stricter requirements for
    connection of generators to the grids in Sweden
    and the northern countries. The new requirements
    will contribute to higher investment costs
    regarding devices and power plants, but also more
    comprehensive analysis and tests have to be done,
    to verify that the power plant is fulfilling the
    new requirements. In this thesis work, the aim is
    to estimate how much the investment costs will
    increase and to describe how necessary tests and
    calculations should be done in practice, to
    verify and fulfill the new requirements in Sweden
    and the northern countries. The study will be
    very useful for both grid owners who will make
    the demands on the connection point, and for the
    power plant owners who are responsible for that
    the requirements are fulfilled and due to that,
    have to make demands on the manufactures. The
    thesis work will include - comparing new and old
    requirements, describing the need of new devices,
    describing the possible need of a more robust
    system and developing a proposal on how the tests
    and calculations have to be done. The study can
    also occur measurements and tests in power
    plants, calculations and estimates on how much
    this will increase the costs, due to the new
    requirements. In the study will one or maybe two
    already existing wind farms be used as reference
    plants.
  •  
  • Project start planned to August- September 2013

Implementation
Activities
  • Study of literature concerning current SvK
    requirements, new EU requirements, ASP
    (Association of larger production facilities) and
    any previous studies on the connection
    requirements.
  • Create a checklist with actions for verification
    of a new wind farm according to requirements.
    International requirements, requirements as may
    be decided by Swedish authorities, the
    requirements which may be included as a
    certification from the manufacturer and the
    requirements described in ASP that are not
    included in the EU requirements.
  • Develop Study Outlines with descriptions of
    necessary input data, models and methods
    regarding calculations and analysis.
  • Develop a test plan for necessary verifying and
    validating of measurements describing how these
    tests should be done in practice.
  • Perform measurements and tests according to test
    plan on an existing power plant.
  • Perform calculations for verification of the new
    requirements on an existing power plant.
  • Describe possible need of a more robust power
    plant and extra control equipment.
  • Estimate the increasing investment costs for new
    power plants regarding the new requirements.
  • Compile the results in a report, written in
    English, which can be used in Nordisk Vindkrafts
    and Midrocs future projects.


We are looking for
  • 1-2 masters students in electrical power
    engineering. The students need to be able to read
    and understand Swedish
  • For more information contact
  • Pehr Brunnegård, Midroc, 010-4707035
  • Pehr.brunnegard_at_midroc.se
  • or
  • Jonas Strandberg, Nordisk Vindkraft, 031-339 59
    71
  • jonas.strandberg_at_nordiskvindkraft.se
  • At Chalmers Ola Carlson, 031 772 1637
  • ola.carlson_at_chalmers.se

2
The thesis work will contain following parts,
which will be time estimated and defined in the
initial phase of the study