Title: Entergy Transmission Proposed Transmission Reliability Projects
1Entergy TransmissionProposed Transmission
Reliability Projects
- Entergy Transmission Planning Summit
- New Orleans, LA
- July 10, 2003
2Topics
- 2004 - 2008 Transmission Reliability Projects
- 2009 - 2013 Transmission Reliability Target Areas
- 2004 Transmission Infrastructure Projects (Asset
Preservation)
3Caveats onProposed Transmission Reliability
Projects
- Cost estimates provided, in most circumstances,
are planning-level estimates. In addition, these
costs do not include overhead and tax gross-up,
which could be as high as 70 of the costs cited. - Siting of new generation and load growth could
affect the timing and necessity of the proposed
projects. - Most of the proposed projects, which are subject
to Jurisdictional review and approval, have not
yet been budgeted. External considerations
(i.e., out-of-cycle projects or budget
adjustments during the year) could impact the
proposed in-service dates.
4Transmission Area Planners
- A. Arkansas
- Stacy Hamilton (504) 310-5451
- B. Mississippi
- Mark Haydel (504) 310-5856
- C. SE Louisiana
- Barry Canzoneri (504) 310-5813
- D. SW Louisiana
- Terrence Griffin (504) 310-5817
- E. Texas
- Clay Adams (504) 310-5814
- N. Louisiana
- Darrel Hotard (504) 310-5852
- Manager
Little Rock
F
Jackson
W. Monroe
Baton Rouge
Beaumont
New Orleans
Note Geographic boundaries are approximate.
5Transmission Project Development
A. Arkansas Jerry Reed 501-490-4703 B. N.
Louisiana Mississippi Rick
Bewley 601-368-2005 C. Texas Chuck
Hughes 409-347-5118 C. Texas Ronnie
Trevino 409-347-5117 D. Lake Charles / N.
Louisiana Ed Brawner 337-593-7333 E. Southeast
Louisiana Russell Saliba 504-310-5874 Manager
Tom Lanigan 504-310-5866
Note Geographic boundaries are approximate.
6Transmission Services
A. Arkansas, N. Mississippi Mike Doyle (501)
490-5643 B. N. Louisiana, S. Mississippi, S.
Louisiana Gerald Gibson (504)
310-5867 C. Texas Carl Olson (936)
525-2040 D. SW Louisiana IPPs Cogens Carl
Olson LaGen Coops Gerald Gibson Interconnection
Coordinator Dennis Broussard (504)
310-5878 Sr. Wholesale Exec. James Howard
(504) 310-5881 Analyst Kim Mitchell (504)
310-5879 Manager Ollie Burke (504) 310-5864
Note Geographic boundaries are approximate.
7OASIS-Posted Information
- http//oasis.e-terrasolutions.com/OASIS/EES
- Planning models
- Generation interconnection studies status
- http//oasis.e-terrasolutions.com/documents/EES/tr
ans_planning_summit_2003.htm Presentations from
todays meeting
8Load Growth Projections
Record System Peak 22,052MW1 EAI 5,533MW with
AECC 6,865 EGSI 7,042MW ELI 5,124MW EMI 3,130
MW ENOI 1,223MW
Hot Springs
Little Rock
Jackson
W. Monroe
Baton Rouge
Conroe
New Orleans
Beaumont
1 This demand level is the all-time peak demand
on the Entergy system less AECC, which occurred
on 8-30-00. With AECC, the peak was 23,384MW.