Title: Presentaci
1EXPERIMENTAL RESULTS OBTAINED IN SMALL WIND
TURBINES TEST PLANT. NEW PROPOSALS FOR THE
MEASUREMENTS
Luis Cano Santa Bárbara CIEMAT-CEDER (Spain)
2- INDEX
- Background.
- CIEMATs SWT activities.
- National RD Project. (PSE Miniéolica).
- Results.
- Analysis.
- Proposals to the measurements.
- Conclusions.
3- BACKGROUND
- CIEMATs SWT activities is being carried out
since 1998. - Capacities
- Power Performance Test (in accordance with IEC
61400-121). - Noise Emission Test (in accordance with IEC
61400-11). - Duration Test. (in accordance with IEC 61400-2).
- Safety and Function Test. (in accordance with
IEC 61400-2). - SWT Components Test (p.e. Blades, generator,
etc). - Other tests interesting for the SWT research.
- Hybrid systems based on Small Wind Turbines.
Evaluation, study and design control strategies
(PV-Wind and Wind Diesel systems).
4- FACILITIES
- Test Facility Phase I, (PEPA I) SWT up to 6
kW. - Test Facility Phase II, (PEPA II) SWT up to 20
kW. - Test Facility Phase III, (PEPA II) SWT up to
100 kW. (under construction). - Blades Test Bench. Nominal length 1 to 10 m.
- Generators Test Bench. Up to 100 kW (under
construction). - New building for the study of SWT integration
in the architecture (under construction).
5100m Mast
Wind Pumping
Central building
Wind-diesel system
- 100 m height anemometer mast.
- Wind pumping system.
- Wind-diesel system.
- Central building.
- 4 Test positions.
- Battery bank up to 300 V.
- Uninterrupted Monitored System up to 128
channels. - Different Loads to simulate consumes.
- Inverters/chargers SWT test versatility.
6- Inverter Test.
- Study of Isolated Hybrid Systems or connected to
Weak Grids. - Possibility of installation, design and
characterization of new systems based on Wind
Energy desalination, wind-hydrogen, etc. - Study of quality of energy in generators
connected to the grid. - 5 Test Positions up to 20 kW.
7FACILITIES PEPA III
- Wind Turbines Grid integration.
- Possibility of installation, design and
characterization of new systems based on Wind
Energy desalination, wind-hydrogen, etc. - 8 Test Positions up to 200 kW.
8FACILITIES BLADE TEST BENCH
Blades from 3 to 10 m
Blades from 1 to 3 m
- Static Test.
- Proper Frequencies Study.
- Fatigue Test (under construction).
9FACILITIES GENERATORS TEST BENCH
Control and monitoring system
Electronic Loads
Drive motor
Torque measurement
Small Generator
- Different test to generators in accordance with
Standards IEC 60034. - Efficiency.
- Voltage-Current Curves.
10FACILITIES NEW BUILDING
UNDER CONSTRUCTION
- Vibrations and noise.
- Study of the behaviors of SWT on the rooftops.
- Comparison and demonstration of different
technologies.
11- National RD Project. PSE- MINIEOLICA
- Objective
- Reduce the installed cost of SWT to 1500 /kW.
(p.e. large series manufacturing, fast blades
manufacturing process, development of control
systems, inverters, etc.). - Energy production cost 10-15 c/kWh with wind
speed of 5-6 to 10 m/s. - Increase the SWT reliability to achieve a 90 of
availability. - Dynamize the SWT market. Target. 100 MW
installed in a medium period. - Establish the certification and homologation
procedures and centers. - Rise the Spanish SWT exportations.
12- National RD Project. PSE- MINIEOLICA
- Subprojects in which CIEMAT is involved
- SP 1.2Active yaw power regulation SWT.
- SP 1.3 Development of high performance and low
cost SWT of 25/50/75 kW, with pitch control and
variable speed. - SP 2.1 Design and Evaluation of Rotors.
- SP 2.2 Development of multipurpose systems to
regulate, control and supervise SWT generation
systems. - SP 3.1 Measure and Test all the Spanish
commercial SWTs. - SP 3.2 EOLMAP. Spanish Wind Map for SWT
installers and end users. - SP 3.6 SWTs Standardization.
13National RD Project. PSE- MINIEOLICA SP 3.1
Measure and Test all the Spanish commercial SWTs.
SWT Power Performance Noise Duration Safety
Bornay 1500/24 On going
Bornay 3000/48 On going
Windeco VENTO 5000/48 On going
Bornay 3000/24 On going - - -
Solener VELTER III On going - - -
Solener VELTER X On going - - -
14National RD Project. PSE- MINIEOLICA Results
Bornay Inclin Neo 1500
HIGH UNCERATINTY
SOME POINTS ARE OUT FIGURE
15National RD Project. PSE- MINIEOLICA Results
Bornay Inclin Neo 3000
DOUBLE REGULATION?
LESS UNCERTAINTY
16National RD Project. PSE- MINIEOLICA Results
WINDECO VENTO 5000
BAD CONTROL STRATEGY
17- National RD Project. PSE- MINIEOLICA
- Analysis
- Significant variations has been detected between
the measurements obtain and the expected ones
(above all in the AEP curve). - Its important to define quite well the
regulation system in case of active control. - The results in noise emissions should be better
in case of a massive installation. - A vibration analysis could be recommended in
case of mounting over rooftops. -
18- Proposals
- Background
- It seem that the results are nor exactly what
its expected. - That could mean, there would be several variables
dont take into account (p.e. turbulence,
obstacles, etc). - AEP Curve is one the most important data for the
costumers. - The results in these curves are very uncertain in
low wind speed. - The cost of tests are very high for the
manufacturer.
19- Proposal
- The SWT labeling could be a very good idea for
the market. - In this way, it should be necessary international
initiatives, for example the IEC WG2 for 61400-2
new edition and IEA Task 27 liaison to get
better procedures to certificate and labeling
future SWT. - Fitting curves in all the tests could be an
interesting possibility to reduce the cost. - Noise emission test defined in the IEC 61400-11
is defined to Wind Farms, not in an urban site
(p.e.)
20Proposal Fitting curves. One line of work.
Average wind machine power
Electrical power
Weibull probability density
Test obtained
21- Conclusions
- CIEMAT is making significant efforts to promote
the increase of the reliability of Spanish
commercial SWT. - Some new initiatives to produce advanced local
wind turbines in a range around 100 kW are being
widely considered. - It should be needed to focus more investigations
on the measurements of the SWTs and their
components. - Its necessary to develop new tools for the
manufacturers training. - The actual measurement procedures should be more
reliable. An important way for research is
opened. - An effort on the standardization and/or labeling
to carry out a friendly useful output for the end
user and it should be made in a short period of
time.
22THANK YOU VERY MUCH FOR YOUR ATTENTION
CEDER-CIEMAT LUIS CANO. luis.cano_at_ciemat.es Tel.
34975281013 Ext 324 Autovía A-15. Salida
56 42290 Lubia. SORIA (SPAIN)