Undulator System Tests - PowerPoint PPT Presentation

About This Presentation
Title:

Undulator System Tests

Description:

Undulator System Tests Marion M. White ANL-ASD-LCLS – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 26
Provided by: Mario304
Category:

less

Transcript and Presenter's Notes

Title: Undulator System Tests


1
Undulator System Tests
  • Marion M. White
  • ANL-ASD-LCLS

2
Outline
  • Testing Scope and Deliverables
  • Single-Undulator
  • Multi-Undulator
  • Measurement Plans and Requirements
  • Schedule
  • Summary

3
Two Tests to be Carried Out
  • Single Undulator Module Test
  • Multiple Undulator Module Test

4
The Two Tests Single
  • Single Undulator Integrated System Test
  • _at_ ANL
  • Prototype undulator cant wait for 1st article
    no need to
  • Prototype support/mover system Cradle, CAM
    movers, Rollaway system, controls software and
    hardware
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber
  • WPM, HLS, BLM sensors
  • Fixed Support or actual prototype
  • Earthquake protection bracing

5
Goals of the Single Undulator Test
  • Provide critical input to the S/M system design
    reviews.
  • Help to determine whether the support/mover
    system design is ready for final production.

6
Deliverables Single Test
  • Measurement of cradle and rollaway motions
  • Determine precision and reproducibility of
    motions, including start and stop
  • Check for interference
  • Measure vibration damping or (hopefully not)
    amplification.
  • Measure position stability and temperature
    dependence of components and subcomponents.

7
The Two Tests Single
  • Single Undulator Integrated System Test
  • At ANL
  • Prototype undulator no time for 1st article and
    no need
  • Prototype support/mover system Cradle, CAM
    movers, Rollaway system, controls software and
    hardware
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber
  • Fixed Support or actual prototype
  • WPM, HLS, BLM sensors
  • Earthquake bracing

8
Preparation _at_ ANL
  • Test to be done in APS Magnet Measurement Area
  • Temperature regulated
  • May need to construct a temporary plastic tent if
    present thermal regulation is inadequate.
  • Clean area
  • Adequate space
  • Experienced People
  • Deliverables of the test are critical to our
    scope and schedule

9
The Two Tests Single
  • Single Undulator Integrated System Test
  • At ANL
  • Use the prototype undulator - no time and no
    need to wait for the 1st article
  • Prototype support/mover system Cradle, CAM
    movers, Rollaway system, controls software and
    hardware
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber
  • Fixed Support or actual prototype
  • WPM, HLS, BLM sensors
  • Earthquake bracing

10
Prototype Undulator at ANL
11
The Two Tests Single
  • Single Undulator Integrated System Test
  • At ANL
  • Prototype undulator no time for 1st article and
    no need
  • Prototype support/mover system
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber
  • Fixed Support or actual prototype
  • WPM, HLS, BLM sensors
  • Earthquake bracing

12
S/M Prototype under construction

13
Support/Mover Prototype includes
  • Cradle
  • CAM movers and motors
  • Rollaway system

14
Support/Mover Prototype includes
  • Cradle,
  • CAM movers,
  • Rollaway system,
  • Controls hardware software
  • Temperature monitoring
  • Position settability and monitoring
  • Verification of motion
  • Verification of limits
  • Reproducibility and smoothness of start and stop

15
Scope Layout
Wire-Flag or BPM ?
Quad BPM
16
The Two Tests Single
  • Single Undulator Integrated System Test
  • At ANL
  • Prototype undulator no time for 1st article and
    no need
  • Prototype support/mover system Cradle, CAM
    movers, Rollaway system, controls software and
    hardware
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber pumps tees
  • WPM, HLS, BLM sensors Wire Scanner
  • Earthquake bracing
  • Fixed Support or actual prototype

17
Use of Substitute Units
  • The quadrupole, BPM, and vacuum chamber will be
    same-size and same-weight fiducialized substitute
    units when prototypes or first articles are not
    yet available.
  • Pumping crosses and pumps will be used
  • Cabling will be incorporated
  • Magnet water piping will be incorporated
  • WPM, HLS, BLM sensors will be incorporated
  • Some kind of Earthquake bracing will be
    determined in collaboration with the SLAC safety
    committee, and will be incorporated it will
    probably not be the final system

18
The Two Tests Single
  • Single Undulator Integrated System Test
  • At ANL
  • Prototype undulator no time for 1st article and
    no need
  • Prototype support/mover system Cradle, CAM
    movers, Rollaway system, controls software and
    hardware
  • Quadrupole with fiducialization surfaces
  • BPM with fiducialization surfaces
  • Vacuum Chamber
  • Fixed Support or actual prototype

19
Fixed Support
  • ANL assumes the Fixed Support scope we are
    working toward having a prototype ready and
    instrumented for the Fall 2005 tests.
  • Availability of FS prototype permits monitoring
    its behaviour as well.
  • If unavailable for the single test, a solid
    backup support will be used

20
Schedule Single Undulator Module
  • Design/procure vacuum/diagnostic components
    starts next week
  • Develop detailed plan and fixed-base design.
    Start June 05 - engineering specs well in hand
    then.
  • Prepare controls HW/SW Jun-Aug 05 debug
  • Prepare test area Jun-Aug 05 monitor
  • Prepare/fabricate test stand and components
    August thru November 2005 Assemble Components
    latest December 2005
  • Short term test complete by mid-January 2006
    leads to FDR 2-month test continues after that.

21
Prototype Undulator scheduling
  • Design, instrument, and verify shipping container
  • Ship prototype undulator to SLAC in the June 05
    timeframe for setup and integration of MMF
    instrumentation and systems.
  • SLAC ships prototype back to ANL for assembly
    into single-module test.

22
The Two Tests Multi
  • Two (or three) undulators with long and short
    breaks will be mounted on fixed supports
  • Ideally, includes wire position monitor segment
    and hydrostatic level at least the mountings
    and sensors.
  • Contains production first articles.
  • verify form and fit of all subcomponents,
  • Refine assembly procedures
  • Assist in development of maintenance procedures
  • Refine alignment and realignment procedures

23
Multi-Undulator Test
  • Can be done at ANL or SLAC
  • First article undulators and subcomponents will
    be available at ANL after acceptance
    verification.
  • Stable area _at_APS
  • Initial assembly and testing will take place at
    ANL then ship to SLAC for long-duration testing
    at MMF.
  • SLAC personnel would participate in the testing
    and analysis, and would learn first from
    experienced ANL personnel.
  • Schedule is dependent on preparing the area and
    on first article delivery schedules follow-on to
    the Single-module test. First 2 undulators
    available by 3/06.

24
Deliverables
  • Everything from the single-module test plus
  • validate relative motion and alignment between
    two modules and stability
  • Additional software - development and debugging
  • verify no constraints from final cabling and
    earthquake bracing

25
Summary
  • A test of a single-undulator-module assembly will
    be carried out at ANL in Fall/Winter 05 using
    prototype and substitute components to provide
    critical data for the support/mover system final
    design review prior to RFP.
  • An integrated multi-undulator-module assembly
    will be done when first articles are available,
    testing component fits, verifying assembly and
    installation procedures, verifying relative
    motion and motion limits, and monitoring thermal
    and vibration stability.
Write a Comment
User Comments (0)
About PowerShow.com