Transcript and Presenter's Notes

Title: Disk Sector Status


1
Disk Sector Status
  • E. Anderssen, M. Gilchriese, F. Goozen, N.
    Hartman, T. Johnson, F. McCormack, J. Taylor, T.
    Weber, J. Wirth and D. Uken
  • Lawrence Berkeley National Laboratory
  • W. Miller
  • HYTEC, Inc

2
Design
  • Sectors alone
  • ProE model has been checked into the LBNL drawing
    system.
  • Flat drawings have been/are being put into EDMS
  • Tooling drawings to be done in ProE and handled
    similarly
  • No major changes in design(except see below) but
    many minor changes as all dimensions, tolerances,
    etc are checked
  • Sector-section of Local Supports Requirements
    document updated.
  • Disk model
  • Previous layout had disk support ring of 1st
    disk(one closest to IP) reversed to provide more
    room for barrel services. This caused sectors for
    Disk 1s to be different than sectors for Disk 2
    and 3.
  • Decided to make all the same - reverse all disks
    gt all sectors identical
  • Added benefit is that disk support ring can now
    be used for strain relief of tubes and pigtails
    using glued-on features on the disk support ring.
  • Disk model updated with latest design from Hytec
    but not yet checked into LBNL drawing system or
    into EDMS. This should be done shortly.

3
Sector Model
Tube extended to pass over disk support ring
All disks will now be like this
4
Frame Model
  • Frame model has been updated to new envelopes and
    revised disks.
  • Next step is cone/barrel interface and also
    length.

5
Prototypes
  • Little new
  • One sector is slowly being irradiated at LLNL
    source
  • TV holography system commissioned at LBL
  • First sector measurements made and look OK(well
    within spec)
  • TVH system returned to Hytec for upgrade to
    in-plane measurements. Back in March.
  • Materials on hand for building three more
    prototypes to current design dimensions.
  • One will use CGL to bond to Al tube.
  • Two will use AIT EG7658, a rigid bonding.
  • Current baseline with CGL has passed all tests
    and meets all requirements so farbut clearly a
    rigid bond is more comforting.
  • Will start about now tests exposing
    sector(actually piece already irradiated to 50
    Mrad) to C3F8 vapor to begin test of possible
    effects in case of maximum leak rate.

6
Production
  • Aluminum tubes ordered. Minimum order will cover
    full production. Delivery by mid-June.
  • Carbon-carbon plates for sectors and disk ring
    facings ordered. Also production order(20
    plates). Delivery by early Junebut have some
    concerns related to power crisis in California
    (furnace time)..
  • Other materials(foam, cyanate ester, etc) have
    much shorter lead times, will order in coming
    months.
  • Detailed production schedule. Will begin to
    measure progress vs plan in formal way(monthly
    status, complete, etc) in April.

7
Frame Drilling
  • Have started tooling for drilling precise holes
    in frame to locate disk mounts.
  • Will try on prototype frame.
  • Tooling under fabrication(http//www-atlas.lbl.gov
    /goozen/supportframe.html)