Description:

Problem appeared during rough cutting of carbon-carbon plates by vendor. ... But cutting to final shape using milling machine at LBL gives good edges. ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 6
Provided by: wwwphys
Category:
Tags: disk | sector | status

less

Transcript and Presenter's Notes

Title: Disk Sector Status


1
Disk Sector Status
  • E. Anderssen, M. Gilchriese, F. Goozen, N.
    Hartman, T. Johnson, J. Wirth
  • October 11, 2001

2
Carbon-Carbon Faceplates
  • Problem appeared during rough cutting of
    carbon-carbon plates by vendor. Vendor did rough
    cut by hand with template and sharp knife on
    compliant surface, causing edge chipping. But
    cutting to final shape using milling machine at
    LBL gives good edges.
  • We have accepted complete order and all pieces
    have been rough cut, and there is additional
    material stored by vendor.
  • 10 faceplates have been final cut at LBL and
    dimensions inspected using automated procedures
    on SmartScope. All 10 are usable but need to fine
    tune cutting program to bring all dimensions into
    range of /- 25 microns of nominal. Critical
    dimensions(holes) OK already.
  • After fine tuning, will cut and inspect in
    batches of 20.

3
Aluminum Tubes
  • Production order of tubes was delivered already
    months ago. Bending and other tests all OK. But
    problems laser welding - see talk by Neal
  • As a result of problems, ordered and have
    received tubing from old vendor for which laser
    welding tests were OK. These tubes must be
    etched(by about 50 microns) to correct wall
    thickness and are a slightly different size(75
    microns in one direction) than other tubes.
  • 10 of the new, old tubes have been prepared for
    annealing and etching by about now.
  • Also must do laser welding tests.

4
Fixtures and Other
  • Tube bending fixture completed and used but will
    have to see if modifications(new inserts) needed
    if old tube dimensions used.
  • Current estimate is that completion of all
    fixtures is about a month from now but clearly
    need to use them before declaring all fixtures
    ready for production.
  • We have slowed down some this effort recognizing
    that critical path item is currently coolant
    fittings and same technical personnel have had to
    divert some effort to other parts of ATLAS(SCT
    modules).