Description:

As a result 3 glued pad plane panels (from 18) have a defect ... soldering anode wires, check break off wires, additional gluing. ?. x. transferring anode wires ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 20
Provided by: z154
Category:

less

Transcript and Presenter's Notes

Title: TRD chamber production


1
DUBNA
TRD chamber production
  • Box
  • Pad plane panel
  • 2 persons
  • 2 gluing table
  • 1 vacuum table
  • Winding
  • Wires transfer
  • Gluing pad plane
  • panel
  • 2 persons
  • 4 working places
  • Test
  • person

TRD status meeting, 3-5 January 2005, GSI
O.Fateev
2
Time schedule of chamber production
day 1 2 3 4 5 6 7 8
work                
box gluing                
assembling and gluing side and front profiles ?              
radiator gluing (outside) ? ? ?          
radiator gluing (inside)       x        
PCB HV divider gluing         x      
PCB HV divider soldering           x    
HV cable gluing           x    
HV cable soldering and check flatness             x  
HV test               x
padplane panel                
preparation of padplanes ? x    x x    
back panel gluing (before friday)     x     x   
cutting of padplane       x      x
check pad-cable contact       x      x
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
3
Mechanical tolerance
  • Some problem
  • box
  • Bending of L-profiles runs up to 1.2 mm
  • Suitable value lt200 mkm ------ 100-150
    mkm on glued box
  • Torsion of wacosit front profile unusable
  • Radiator flatness sometimes is not good
    especially on the corners
  • Position of ledge on L-profile does not
    correspond to position of front
  • profile ledge
  • We should check diameter of holes in front
    profiles (use gas connector)
  • Remove surplus of glue from holes during gluing
    of gas connectors into
  • front profile
  • Pad plane panel
  • We should check a quality of cable soldering to
    the pads.
  • As a result 3 glued pad plane panels (from 18)
    have a defect
  • (no contact between pads and outside
    cable)

TRD status meeting, 3-5 January 2005, GSI
O.Fateev
4
PAD PLANES
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
5
Clean rooms
Climate control Fan filter units
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
6
Time schedule of chamber production
     1  2  3 4  5  6  7  8 9  10 11 12 
wires transferring                            
winding cathode wire planes ? ?           x   x          
measurement of cathode wires tension on the winding frames     ?  x                    
transferring cathode wires     x ? x                   
winding anode wires planes     ? ?                  
soldering and cutting cathode wires, measurement tension         ? ?                
measurement of anode wires tension on the winding frame           ? ?              
transferring anode wires             x ?            
soldering anode wires, check break off wires, additional gluing               x ?          
cutting, measuring tension of anode wires                 x x        
distance ledges gluing                   x ?      
HV test on air                     x ?    
prime glue into gap                       x ?  
HV test on air with pad plane panel                         x ?
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
7
Wire transferring
  • 3 microscopes are used to define right wire
    position relatively to reference hole
  • precision 50 mkm
  • Special pins are used for anode wire transferring
  • Head 10 mm diameter, 3.5 mm height, 20 mkm
    precision
  • Chamber is fixed to a table

TRD status meeting, 3-5 January 2005, GSI
O.Fateev
8
Wires transferring
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
9
Anode wire quality
glue
  • Some anode wire has bad quality
  • We have lost 1 chamber, and 1 bad chamber was
    repaired ( dark current was gt500 nA when
    chamber was tested on air under 1500 V anode
    voltage)
  • Do not touch anode wire during the wires
    soldering.

solder
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
10
Wire tension
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
11
Testing
  • Gas mixture Ar/CO2
  • 8 keV X-ray tube
  • Movement X-ray tube by hand
  • Measurement
  • - dark current
  • - dependence of anode current from HV
  • - gain uniformity
  • Anode current reads out to PC
  • 3 cm pitch is used for gain uniformity
    measurement

TRD status meeting, 3-5 January 2005, GSI
O.Fateev
12
Test results
Leakage current range 0-50 nA at 1500 V anode
voltage
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
13
Test results
4 clamps was installed
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
14
Test of L1C04 unglued chamberhomogeneity of
radiator, gain uniformity of chamber
Additional clamps were installed (along Z)
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
15
Test results
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
16
Test results pad plane panel is not glued to
chamber
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
17
Test results
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
18
Documentation
Mechanical tolerance
Chamber ?
test information
Cathode 75 ??? Cu-Be file name
_____________ Wire tension max min average
deviation Anode 20 ??? Au-W-Re file name
_____________ Wire tension? max min average
deviation
TRD status meeting, 3-5 January 2005, GSI
O.Fateev
19
  • Conclusions
  • 13 chambers are ready and tested
  • Gain uniformity 25-30
  • 2 chambers (under transferring of anode planes)
  • 4 boxes and 19 pad plane panels are ready
  • Time which we intend to spend for 2 chambers
    production is 8 days
  • For that we need to arrange 2 additional working
    places (for gluing pad plane panel to chamber and
    for testing)
  • We need to get the materials (before April) from
    GSI/HD
  • - Front and side profiles
  • - Pad planes
  • - Gas connectors

TRD status meeting, 3-5 January 2005, GSI
O.Fateev