BigBite Spectrometer Equipment
  • by
  • Douglas W. Higinbotham

2
BigBite Family of Experiments
  • Threshold Pion Production (Hadron Package)
    Cryo-Target
  • Transversity d2 (Electron Package) 3He Target
  • Ay (HRS) (e,ed) (Hadron Package) 3He Target

3
BigBite Infrastructure For Transversity
  • Magnet Continues To Work Without Issue (one spare
    coil)
  • Power Supply Has Had Only Minor Problems
  • Problem Tends To Be With Communication
  • We Rarely Change Field, So Not Big Issue
  • Technicians Have Tried To Fix This
  • Extremely Tight Space To Get To 30 Degrees
  • New Right Foot Designed and Ordered
  • Work On Beam-line Area Needs To Be Done (Folts)
  • GEN Field Clamp Extended
  • Re-use GEN Side Shielding
  • Add Better Internal Shielding (Multi-Experiment
    Problem)

4
BigBite Detectors For Transversity
  • Three Full Wire Chambers
  • Send Middle Chamber To UVa During March
  • Designer Assigned
  • Upgrade Chamber Major Item For Review
  • Trigger Scintillators
  • PreShower Shower Detector
  • Several PMTs Marginal (near 2kV) and Few Dead
  • Either Buying 60 PMTs or 10 PMTs
  • NEW Gas Cherenkov Designed by Brad
  • Major Item For Review
  • Asked JLab For 60k This FY For This Project

5
Wire-Chamber Electronics
  • We have both VME and Fastbus! Though would need
    four more VME units for middle chamber read-out.
  • 200 pre-Amp cards and associate equipment in
    production.
  • Over 100 have been delivered.
  • Rest In The Electronics Groups Queue
  • 40 more pre-Amp cards are being ordered.
  • 210 needed for three 6 plane chambers (240 total
    order)

6
Electronics and Cables
  • All experiments will share wirechamber
    electronics.
  • The pi0 (e,ed) experiments will be using
    mostly their own NIM/CAMAC electronics.
  • d2 and Transversity NIM/CAMAC electronics
    converging, BUT not yet finalized.
  • Brad is adding Cherenkov to trigger setup
  • Must be done in the coming week!
  • Albert Coming To Help Supervise Construction

7
Test Lab
  • All BigBite experiments share the test lab space.
  • Douglas Manages The Space
  • Eugene Is Area Safety Warden
  • Bertha Power Supply (440V) Needs To Be Moved To
    Test Lab
  • Single Source Of Power
  • Solves Outlet Problem and Hopefully Grounding
    Problems
  • Safety Is Important
  • Some Items Need Safety Procedures
  • Procedures Needs Many Signatures
  • Once GEP III Leaves, We Will Get Some Space Back
  • BUT, It Will Continue To Be Very Crowded
  • Work Safely!