Title: AMS Tracker Thermal Control System TTCS


1
AMS Tracker Thermal Control System (TTCS) TTCS
Progress TIM CERN July 2008

2
TTCS presentations
  • Contents
  • NLR Overall progress overview/planning,
    TTCE-progress, pinching testing, (J. van Es)
  • SYSU EM 3D testing, Condenser QM test
    preparations (Zhenhui He)
  • INFN/AIDC  Transport tubing, HX
    Condenser(presented by Elisa Laudi) 
  • AIDC Box integration and preparation (DrJ Sun)

3
(No Transcript)
4
TTCS Progress Overview
  • TTCS Progress summarised in two sheets
  • Transport tubing brackets in manufacturing
  • Tubing integration in September at SCL
  • Condensers (details by INFN/AIDC)
  • QM brazed and glued (almost finished)
  • FMs 4x already bend ready for brazing
  • TTCB Component boxes (SYSU/NLR/AIDC/INFN) details
    by AIDC
  • Complex FM components (Accu, APS/DPS) available
  • Pre-heater 4 FMs available, re-production on QM
    and FS
  • Cold Orbit Heater (COH) rework QM done, FM within
    weeks
  • Heat Exchanger (welding qualified, 2nd brazing
    done)
  • Mechanical parts (design iteration finished, in
    production _at_ AIDC)
  • Thermostats, weld connectors, Pt1000s, foil
    heaters, are at AIDC or will arrive coming week
    (nuts, bolts)

5
TTCS Progress Overview
  • TTCS Progress summarised in two sheets
  • Box integration and procedures
  • Incoming inspections on-going
  • Tube weld qualification procedure finished
  • Integration plan (upto finalisation) and
    procedures (on-going)
  • Functional check S/W under development (L.
    Accardo, G. Alberti)
  • Pinch testing started at NLR
  • TTCS EM testing (see presentation Zhenhui He)
  • Micro-g testing finished
  • 3D-testing primary loop (first tests ? successful
    operation in broad T-range)
  • TTCE progress
  • Testing S/W and firmware on-going by Lucio
    Accardo and Gabrielle Alberti
  • Supported by Alexei and Vladimir
  • H/W FM TTCE finished, FS TTCE qualification
    scheduled

6
TTCS Planning
4x
2x
7
TTCS pinching and final welding
  • Pinching and welding
  • Pinching device procured by NLR
  • Weld method to be discussed in close co-operation
    with Tracker
  • Pinch tests started (leak tightness, proof
    burst pressure)
  • Eddy current issue to Tracker (how big is the
    issue and what can we measure)
  • Baseline is welding with Tracker connectors
    disconnected

8
TTCS other issues
9
TTCS other issues
10
TTCS other issues
  • TTCS cooling during beam testing and KSC testing
  • External cooling on the condenser/radiator
  • Will be discussed Wednesday or Thursday in a
    splinter
  • As we need also a cooling possibility during KSC
    testing and external cooling facility is needed
  • Options
  • Convection cooling by air (capacity is unsure wrt
    dew point)
  • Cold plate attached to condensers with bag around
    to avoid condensation
  • Concentric section on TTCS transport tubing
  • Decision needs to be taken soon as integration is
    in September
  • Low capacity in case section is small due to
    envelope restrictions