SINTEF sensors (160x18), Indium bumps. 3 out of 4 have obvious damage ... Contract with VTT for solder bumping should receive hybrids by Christmas. The End. ...
(at readout clock edge, after. horiz. ... SCLK is constructed from external clocks and is nominally 140 MHz. ... I/O is synchronous clocked by the BCO clock. ...
(Terry Tope) Future. FPIX0 board not designed yet, and will need cooling. ... FPIX1 and FPIX2 boards not built yet. Layout and types of connectors are still not ...
Gerd J. Kunde. FPIX2 Status. Produced 3168 chips in engineering run ... Gerd J. Kunde. PHX Cost. Chip design/testing 2 man-years - $275K (includes all ...
Use Verilog to simulate FPIX2 core (periphery assumed not to lose any data) February 1, 2001 ... Step 3: Verilog Simulation. Very simple model of sensor/FPIX front end ...
Working on pixels test beams since 1998. ( First testbeam run in 1999 testing fpix0) ... Designed the pixel planes for all BTeV and the last two CMS test beam runs. ...
Realistic parameters of the front end electronics (noise,threshold, digitization ... Relative Fraction of Cluster (row) Size. Delta ray emission results in ...
The new Louvre configuration file editor. Why do we need a new configuration file editor? ... The existing Louvre was really difficult to upgrade: I designed a new one ...
ESE Section Status Personnel We are still three people down from April last year. I will be hiring soon but there will not be resource improvement for several months.
Dosimetry : Faraday cup SEM. FF in DAC (112 in chip) FF in SR (1152 in chip) ... Board. April 01. April 01 Aug 01 = transition from 0 to 1. = transition ...
BTeV A Dedicated B Physics Experiment at the Tevatron Collider ... Aerogel (?) radiator. Spherical mirrors. Photo-detectors. Vessel to contain gas volume ...
Include real ADC-charge conversion once Lorenzo finishes the calibration. ... And we have only charge weight, no eta correction. Put more realistic expected ...
Fast, self-triggered readout architecture with no analog storage, very similar ... Pulse amplitude information for detector monitoring and calibration ...
System in secondary vacuum and pixel planes as close as possible to ... n pixels on n-type substrates: inter-pixel insulation technology under investigation ...
... has 2 free parameters, i.e. ... Reuse Coincident Logic via Shifting Hit Patterns. C1. C2. C3 ... One should feel free to choose preferred detector layout. ...
ASICs are Critical to Most Detector Systems. SVX4 CDF & DO. VLPC readout - DO ... ASICs have been and will continue to be critical to new detector development. ...
Japanese funding in place, construction started pixel layers ... Install two layers pixels, some strip. Complete strip layers. R&D Endcaps. Proposed DOE Endcaps ...
... systems in future high luminosity colliders (ILC, SLHC, Super B-Factory) ... In future high luminosity colliders, the need to minimize the amount of material ...
The Big Bang and Little Bang. time. Recreating the Early Universe in the ... High Density Interconnect (Kapton bus) Prototypes delivered, working. Sensor. wafer ...