ASAS%20Thematic%20Network - PowerPoint PPT Presentation

About This Presentation
Title:

ASAS%20Thematic%20Network

Description:

ASAS TN2 Final Seminar. Paris, 14 - 15 April 2008. ASAS Thematic ... ASEP-ITP En-Route & Oceanic (2018) ATM Service Levels 4/5 (2020 onwards) ASEP C&P (2020) ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 12
Provided by: lac129
Learn more at: https://asas-tn.org
Category:

less

Transcript and Presenter's Notes

Title: ASAS%20Thematic%20Network


1
ASAS Thematic Network
ASAS Now!
2
ASAS in SESAR
  • ATM Service Level 1(Present to 2012)
  • ATSAW (2010)
  • ATSA-ITP Oceanic (2010)
  • Manual ASAS SM (2010)
  • ATSA-VSA (2009)
  • ATM Service Levels 2/3 (2013 to 2019)
  • ASPA-SM (2013)
  • ASEP-ITP En-Route Oceanic (2018)
  • ATM Service Levels 4/5 (2020 onwards)
  • ASEP CP (2020)
  • Self-Sep mixed-mode (2025)

3
ASAS in NextGen
  • Present to 2010
  • ATSA-VSA ATSA-AIRB ATSA-SURF CAVS
  • ASPA-MS (AOC) ATSA-ITP
  • 2010 to 2015
  • ASEP-ITF ATSA-SURF (Indications Alert)
  • AIRB (Conflict detection) ASPA-MS (ATC)
  • 2015 to 2020 (and beyond)
  • ASEP-CSPA ASEP-FDMS (Transfer of Separation
    datacom enabled)
  • Static Flow Corridors Dynamic Flow Corridors
  • Delegated Separation - pairwise
  • Delegated Separation - complex

4
ASAS Maturity
  • Of 19 applications assessed, 9 have above 50
    maturity scores.
  • Maturity has accelerated from 10 increase in
    scores (2006-7) to 13 (2007-8).
  • Maturity cases-
  • Highest ADS-B-NRA (operational Australia)
  • Lowest ASEP-VCP (score 6/24)
  • Fastest ASPA-SM (UPS MS approval)
  • Versions 1, 2 3 of report on ASAS-TN2 website.

5
ASAS has come a long way in 5 years
  • SESAR and NextGen include ASAS in their long-term
    paradigms.
  • ASAS and trajectory management are symbiotic
  • We used to talk tentatively of ATSA and Spacing.
  • Now the focus is on airborne separation.

6
The ASAS-TN is a unique forum
  • Network of 100 ASAS stakeholders - meeting every
    6 months for past 5 years.
  • It facilitates global co-operation for global
    interoperability.
  • It is a forum for ALL stakeholders.
  • Contributes to a better understanding of
    stakeholder needs.
  • Seeks to identify issues and develop consensus.

7
Moving forward
  • SESAR/NextGen-
  • ASAS in a TM environment
  • harmonise deployment
  • Incentivise pioneer airlines and partnership with
    ANSPs.
  • Realise benefits in oceanic and remote airspace.
  • Early implementation of ATSA-SURF (Safety).
  • ICAO must address ASAS standardisation at a
    global level.
  • ADS-B technology issue.

8
ASAS-TN 2.5
  • We will hold another ASAS-TN workshop towards the
    end of this year.
  • We will link up with the FAAs ASAS Forum.
  • Watch this space!
  • (www.asas-tn.org)

9
Have wereachedCritical Mass?
10
Seminar Report
  • First draft available for attendee review 30th
    April
  • Comments by 16th May
  • Final Report for wider dissemination 10th June
  • Presentations to be on www.asas-tn.org

11
Thank-you
Write a Comment
User Comments (0)
About PowerShow.com