ASAS: - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

ASAS:

Description:

... 1: Benefits including airports. BENEFITS EXPECTED. Increase ... Co-operative ATM, SWIM, dynamic sectorisation... Can we start just in current environment: ... – PowerPoint PPT presentation

Number of Views:45
Avg rating:3.0/5.0
Slides: 14
Provided by: MMTABE
Category:
Tags: asas | benefits | of | swimming

less

Transcript and Presenter's Notes

Title: ASAS:


1
  • ASAS
  • USERS EXPECTATIONS AND CONCERNS
  • ATS Provider Benefits
  • Pedro Rastrilla
  • Aenas ADS Programme Manager
  • prastrilla_at_aena.es

2
ASAS and ADS-B
  • Aena take part in a number of projects related to
    ADS-B enabled applications (including ASAS),
    among which
  • MFF (Mediterranean Free Flight)
  • MEDUP (Mediterranean Upgrade Programme)
  • and will participate in
  • C-ATM (Cooperative Air Traffic Management)
  • SEAP (large Scale European ADS pre-implementation
    Programme)

3
Expectations and Concerns
ADS-B
ASAS
Pilots
Controllers
Ground ATM systems
Surveillance Sensors
Avionics
Clear responsibilities
Benefits
Costs
4
Benefits
  • BENEFITS EXPECTED
  • Increase efficiency of operations
  • Increase capacity (?)
  • ASAS Spacing
  • promising in TMAs and some use in en route
  • special case oceanic airspace
  • Airport surveillance safety?benefits

5
Expectations and Concerns
  • ASAS-TN
  • ASAS is part of PACKAGE I
  • BUT PACKAGE I includes ground surveillance
    applications
  • Implementation of ONE of them paves the way for
    the other
  • ADS-B PACKAGE 1
  • ASAS PACKAGE 1

6
Benefits
ASAS?BENEFITS EXPECTED
  • Similar ground and air infrastructure could
    allow the implementation of different air-ground
    surveillance applications enabled by ADS-B
  • Similar ground and air infrastructure could
    allow the implementation of an improved airport
    surface surveillance
  • availability of ASAS independent of ground
    infrastructure?
  • depends upon the actual use of it.
  • transition (TIS-B)?
  • and controllers are still needed (F.
    Casaux, concluding remarks 1/2)

7
Concerns
  • CONCERNS
  • Need of clear and HARMONISED operational concepts
    and procedures.
  • Sharing of responsibilities has to be very clear
  • Package I?delegation of tasks BUT no delegation
    of responsibility?benefits?
  • How to deal with aircraft of different
    performance ?
  • Sequences in-descent are to be created for each
    specific environment (converging flows)?detailed
    studies

8
Concerns
  • CONCERNS
  • Where to start?
  • (too) many new ideas
  • Free Route, Free Flight, Transitions between
    different areas, ..
  • Co-operative ATM, SWIM, dynamic sectorisation
  • Can we start just in current environment
  • Start simple
  • fixed routes
  • in particular areas
  • .and then implement it together with other new
    ideas
  • ?

9
Concerns
  • CONCERNS
  • Different technologies competing
  • We should have clear operational concepts and
    requirements and THEN we should allow each
    possible technology to demonstrate their
    compliance.
  • The selection of a technologyCAN BE DONE WITHOUT
    CLEAR OPERATIONAL CONCEPT?
  • The deployment/installation of new technology
    (ground and air coordinated) is always very SLOW.
  • What if wrong initial choice and deployment..?

10
Conclusions
  • ASAS Operational Improvements Dream or Reality ?
  • Further work has to be done to define the
    requirements expected (or needed)
  • Further work is to be done on new standard
    procedures
  • Further work is to be done on safety implications
  • .... Many uncertainties are yet to be solved
  • BUT
  • Operators consider that ASAS Operational
    Improvements will be a reality
  • ASAS combined with the other ADS-B enabled
    applications will provide important benefits to
    users

11
Final remarks
  • The initial implementation (or pre-implementation)
    of package I applications (including ground
    surveillance) should be properly focussed.
  • ?not linked to the introduction of other new
    concepts/ideas
  • if linked to other issues
  • ?high risk of making the problem too complex and
    thus nothing actually implemented
  • The work already carried out should form a good
    basis to carry out initial trials
  • New projects like C-ATM and SEAP will allow
    demonstrations of these applications

12
Final remarks
  • Commitment
  • ..to carry out trials?
  • ..to deploy infrastructure (stations?full/partial
    coverage)?
  • ..to change the ATM system?
  • ..to implement new procedures?
  • linked to cost-benefits and airlines equipage

13
The end Thank you for your attention. prastrilla
_at_aena.es
Write a Comment
User Comments (0)
About PowerShow.com